Copyright (C) 2009-2016 ITECTURAL CO.,LTD. All Rights Reserved.
△Message from the Chairman
○The chairperson (Yozo Yamaguchi) has been changed and everyone is good.
△Open
○Chair (Yozo Yamaguchi) The number of members currently attending is 14. We have reached a fixed number of feet, so we will open the meeting today. Today's meeting schedule is as printed distribution.
△Date 1 General question
○President (Yamaguchi Yuzoku) The speech will be nominated from the chairperson according to the order of notification. First of all, Mr. Yasuda.
◆No.12 (Y田da) Good morning. No.12 and No.12 Yasuda. I got the permission of the chairperson, so I would like to ask the chief of the town about the two things. We will ask you about two big projects. First of all, we have宣言d that our city will be created by everyone, in such a basic posture, and in the resident charter, we will create a city that is healthy and peaceful. In order to implement such a town, I think that one of the things that cannot be built without the use of a merger special bond is a new library. I think that the preparation room should not be installed in the town chief office from the 23rd year in order to embody this. I think that construction should be 25 years and 26 years. It is a facility that can be a symbol of mind, though it is a town manager that is always called a merger of mind. I think that it is necessary to have at least two years of preparation even if it is not enough to build the library only here. In other municipalities, it seems that there are many cases in which the director of the museum and the staff are adopted nationwide, but I think that it is impossible to headhunting the director and staff of the public offering nationwide. In addition, there is a library of temporary residences rather than a start from scratch, so I think that it is good for volunteers and residents to cooperate with more powerfully and in a handmade library. I think it is good at Araden library only here. On November 22nd, it was famous for Yasai-cho, Fukushima Prefecture, which was not merged in the Kobe Shimbun.6000 people donated to the library and book donated to the whole country. It became a library with 45 million books. The cost of books is zero. It was also introduced that the social foundation is a good example to be established. When we replace this in Takanamachi, we think that it is sufficient to understand the residents. In21 2009, 20,000 people have been using the library. 1 registered registrant is also registered by 7500 people and 3 residents. There are 172,000 books available. In addition, when the rental service is converted to a service record as 1500 yen, it is effective for 25,000 million yen per year. On March 12, 2008, I think that it should be effective use of 6500m2 and 92 million yen land next to Aspal. However, the world is from concrete to people, and the box tends to be very strong. I would like to know that this is also well, and I would like to tell you the opinion of the chief of the town for the newly built library transfer. It is the second question, but is the basic concept, basic plan and basic design work of the school lunch center suitable? In addition, I would like to hear about the specific contents of the consignment. I had a big question to see the progress and results of consignment work tender. The basic concept, basic plan and basic design business consignment of the Ta-Kancho New School meal center was bid on October 19th, but the amount of the bid is 1,000,000 yen, and the rate of the bid is 35.1%. The number 2 is 4 million yen. On the other hand, 7 companies are over 50,000 yen. You can understand that it is difficult to calculate the expected price for the commissioning fee, but it is a concern whether the rate does not affect the resulting property in the future. In addition, I think that the movement of numbers is too intense for this feeding center. It’s impossible to make a big project. It feels strongly the need to return to the origin. When I saw this bid result table, I thought that I was told about the basic concept and basic plan. Therefore, I found the contents page in the initial budget and budget reference materials, but I do not write anywhere in the educational expenses. Sorry, this entry is only available in Japanese. I looked up to the point where I was working in the subsidy business of the Ministry of Agriculture, Forestry and Fisheries. Lastly, I asked the parliament office where the budget is. I received a response that was corrected in June. I heard this and remembered. I remembered that this important thing was not initial budget, but it was corrected. It was a description that I didn’t estimate the initial budget because I had adjusted and examined the joint feeding center with Nishiwaki City. In addition, since it is a parliament issued in August, it is also a counter論 from two colleagues to "too easy to compensate" and "sufficient explanation to residents". Unfortunately, it was a shy thing, and at that time I praised the basic plan design, and I forgot to say about it. However, if you look at the numbers that come out here and look at the numbers quietly, I think that there are many things that are数字al. First, the contract fee is 8.5 million yen in the correction budget book. The explanation is added to the consignment fee to formulate a basic plan for the construction of the integrated feeding center. All resources are general resources. The basic concept and basic design are not written anywhere in the budget book. It is written as a basic planning business. In addition, the price is 50,000 yen, but the price is 40%. 30% or more are important changes. Since it is not initial budget, it is a correction budget, the educator should be carefully examined more numbers. In this way, the plan price of 50,000 yen is 370,000 yen which is the difference from the budget of 8.5 million yen. In addition, since the price of the bill is 1.8 million yen, it is actually 4.5 times the difference of 661 million yen. What is right? In the February 2009 issue of the policy, the total amount will be ¥77 billion. In addition, the maintenance business costs of social education facilities etc. are 198,000 million yen, and the integration of facilities at the school lunch center is 630 million yen. In order to provide safe and unified meals in three sections efficiently, we have established a facility that integrates a school lunch center in one place. It is assumed to be 630 million yen. I think that even if there is a 30% correction, it is the limit of the number of 820 million yen. However, in the report of the elapsed report of the Ta-Kancho School Food Center Integrated Planning Committee on December 1st, it depends on the basic concept, basic plan, basic design work outsour , and the comparison table of 13 candidate sites, the cheapest one of the approximate business costs is 135,000 million yen. The basic cost is based on 1330 million yen. In short, at least 1330 million yen should be realized to build an integrated feeding center. There was no financial plan for this reason. It is an unfamiliar tea figure that is more than twice the financial plan. In the financial department, the educator in charge of 60,000 million yen was recorded in the financial plan, and the educator in charge of the educator included a total of 135 million yen. It is not conf because it is explained that the member is also a 数字 number. In the first place, the basic concept, basic design and nothing can be seen as a cons round throw, while the basic plan development work in the explanation of the budget book. What is the basic concept of the feeding center? In addition, I think that the feeding center should be considered to be the origin of the renovation of three facilities, not integrating, as a private outsour、 and joint installation with Nishiwaki. I’d like to ask you if you’re a number that has been fully tuned with financial cooperation. In my memory, I remember that there was no plan for the integrated feeding center in the new town construction plan at the time of merger. I would like to hear about the two points.
○Chair (Yozo Yamaguchi) Mr. Toda.
◎ Town manager (Toda Zenki) Good morning. We have two questions from Mr. Yasuda. First of all, I recommend that you set up a new library relocation preparation room from FY23. We are looking forward to seeing you soon! For the first library, I would like to answer from my people and the school lunch center. It is a takanamachi library that I have been touched about now. Thank you very much for your cooperation. It was an example of Yasai, but I also saw that I had read the Kobe Shimbun, and I thought that it was able to improve the book well in such a way. As we mentioned, we have become a huge number of 25,000 million in terms of service performance, and we have recognized that it has become a library where residents can interact with. However, it is now a Ta-Kancho Library, but it is said that it is called aging or deterioration over time. The part of the roof is quite scratched. And as a situation where water leaks have progressed, I have thought that it would be impossible to remodel it now. I think that I have done a response while taking such a way. First of all, we have stated the basic attitude of "Creating our town with everyone" at the beginning of the comprehensive plan of Takanamachi. And as one of the challenges of “Let’s learn and live”, the library is called as a social education facility for learning activities and exchange activities. In order to promote lifelong learning and to create a heartfelt person, the library is one of the most important facilities. I think that I have read a lot of books. The library is also available. The current library is now open, but it means the facility meaning, which is a satisfying library, but it doesn’t seem to be satisfied. We know that the library with the library function of the main building is desirable. In this part, it means that you have to do more enrichment, but now there are not only library functions, but also the point of pointing out that you want to make more enrichment can be understood in many cases. However, there is a financial problem of Honmachi. We also conducted a survey on residents’ satisfaction. As a result, a new relocation in a single library is the only thing that can be assumed as the top priority, and it will be recognized as if it is good at this point. Rather, I think that it should be considered as a comprehensive facility as a base for lifelong learning. I would like to express it to the concrete and think that it is a good idea to think about the plan in a comprehensive center in the form of library functions, public hall functions, and evacuation center functions. Although it is the number 11 of policy-oriented business, it is a business of a merger special bond that has been shown, but it is a little bit, but it is still progressing with a delay. We plan to carry out large-scale business in the future, but it is a problem of how to do this in the so-called office building. It is necessary to think based on whether it will be reconstructed or new construction. If you have any questions, please contact us. I think that it is a large-scale remodeling construction on the plan. It is then the central public hall, but there is a problem that it is necessary to plan a large-scale earthquake-resistant remodeling work. In addition, I think that the school lunch center, which was pointed out by Mr. Yasuda, is also an integrated facility and a new lifelong learning facility with library functions. In this case, we have noted that the facility integration of the school lunch center is in the basic design stage, so it is important to start a large-scale renovation work of the main building, and the construction of the central public hall and the life-long learning facility. I would like to plan to hold the construction review committee according to external experts. It is to whether the preparation room is set up at the town chief office of the proposal of a member, but this is obviously the relationship with the remodeling work of other important facilities that have been raised now. First of all, I would like to consider it based on the proposal at the meeting of public facilities. In the construction of a facility with library functions, I thought that it was natural that everyone of the library council and the members of the lifelong learning promotion committee were able to incorporate opinions. Let’s adjust the opinions as early as possible at the time when the overall idea was made. I would like to make a review of the preparation room and how to make a committee. The second question will be answered by the Board of Education.
○Chair Yuzo Yamaguchi, Director of Education and General Affairs, Manami.
◎ Director of Education and General Affairs Division (Kataka Manami) The basic concept, basic plan and basic design of the feeding center are appropriate for me. First of all, we ask that the first point and the amount of the bill are appropriate, but this person has submitted the results without any problem. Urano Design Co., Ltd. is a major company, and we are currently accepting requests based on the specification. In addition, in the case of this bidding, the implementation design and construction supervision work related to the integration of the Takanamachi school lunch center is stated that it is not the manufacturer of the contractor in this no、 competition bidding. I would like to point out that the basic plan and basic design were not included in the basic concept of the two-point consignment, but at the time of correction, I will talk about the design as soon as I can see the results of the integration as possible when the plan integrates the feeding center. This time, we can propose proposals by including the basic design stage. In addition, the amount is calculated according to the design consignment fee calculation reference table and input table of the Heisei 21 year version. The basis is calculated according to the first chapter of the design calculation criteria for the conference materials of the municipal repairer's meeting in Hyogo Prefecture. It was said that it was about 1330 million people were submitted, and this was the story. I would like to see this center, but the amount of 、 was close to it. I would like to give a discussion first because of why the feeding center is necessary. We provide safe and secure meals for students in Takanamachi. In addition, I thought how to place a meal in education as a food education while thinking about local production of the local industry through food education. In addition, this 30,000 million yen is not ignored by the initial financial plan. However, it is a matter of consideration of the residents, the review committee and the feeding center are very large. When you look at the contents of the review committee that the residents are participating, it is the best form. I will explain that this is not what can be done in 1330 million. Therefore, the basic calculation of the basic design amount is calculated with 600 million yen. In the future, we will discuss about what kind of food center is necessary for Ta-Kan Town, and we will reduce the need, and eventually we will get a bit of the amount that is close to 600 million. If something is called, it is an allergic measure. I didn’t have an idea of allergy counter。s. We have 25 allergic items and 30 items. There are many people who are allergic to the nursery that can enter in the future. For this allergy, we are planning to make a little more greedy because we think that it is not suitable for the service as a town. However, it is not a plan that ignores the 600 millions of members. The basic plan arithmetic foundation is planned as a arithmetic basis, and it is recorded on the correction budget. We would like to inform you of this report.
◆No.12 (Y田da) Chair, No.12
○Chair (Yozo Yamaguchi) No.12, Mr. Yasuda
◆No.12 (Y田sa) First of all, I understand that it is the first library, but I can understand that it is a comprehensive facility of life-long learning, but I think that I am also a person who loves the book, but the library is made up of people in the book "Plan a library". If the chief does not need a library, it is clearly stated that the plan will not go up. In such a situation, the chief of the town was quite positive, but there is a deadline that can be used for a merger special bond. In such a situation, I think that it is necessary to prepare for about two years, but it seems to be even more shiny, but even in the public of the election, the second period is expressed to make the basics of Takana town, so I would like to ask again whether it will be really positive, including here.
○Chair (Yozo Yamaguchi) Mr. Toda.
◎ Town manager (Toda Yoshiki) I said, "Constructing a library" I think I will read the same book maybe. Therefore, the difference between the function and effect of the library is enough to recognize it. However, in order to establish a library, there are quite a few parts that are deviated from my part. I honestly feel that the effort is quite necessary, whether it is said to be the viewpoint of the side. I sometimes have a careful way of saying, so I think that if I don’t do the orientation to the residents in the other hand, I will have to do it. In that sense, the effort to recognize the effectiveness of the library. On the other hand, I repeatedly, but I think that the single library is difficult, so I would like to consider how to cooperate with other facilities, linkage, and what can be integrated assembly. We will replace the answer by thinking about the preparation room etc. at the stage where the comprehensive concept is made.
◆No.12 (Y田da) Chair, No.12
○Chair (Yozo Yamaguchi) No.12, Mr. Yasuda
◆No.12 (Y田da) Is it a comprehensive plan? You must be an individual, rather than a member of the committee, but it is a little clarified about how you can proceed in the direction of the town manager.
○Chair (Yozo Yamaguchi) Director, Yoshiki Toda.
◎The town manager (Toda Yoshiki) is as we answered earlier. You must first decide what to do. In addition, the central public hall, which is raised on the plan, how to do it. The idea of the original is to make a simple shape by doing so-called earthquake resistance. However, if you look at the Central Public Hall, it may not be such a situation. Even if the problem of the location of the library is too long, it may be entered into the scope of the consideration, but it may be impossible to make the initial plan. As it is a complex facility, I can not know whether it is one of the things that I have to bring to the point of view, and there is a question of the post-office building, so I thought that I had been answered for a little while, but I had to hold a review committee of the so-called body early in the new year. In the event of this, we have a team of professional members, and of course, we will explain the remaining issues, the hard challenges, and the software, but we want to create a series of concepts that are about the most common challenges. If possible, it is better. It will be kneaded in the next year even if it is half a year or late. So, I think that I would be able to recognize that I would draw such a schedule in my mind that I would like to make a preparation to enter the individual adjustment again in the form that received the concept.
◆No.12 (Y田da) Chair, No.12
○Chair (Yozo Yamaguchi) No.12, Mr. Yasuda
◆No.12 (Yoshiji Yasuda) I would like to thank you for your efforts to be able to use the library, including the so-called general facility with bravery. It is the second point, but this is the opposite of the financial aspect, I think that it is a tea bitter than how it is. For example, if it is such a thing, I know that it is well regarded as allergy, but I think that there is a hand to remodel the feeding facility which is now. I can’t see my eyes that the three feeding centers are very old. For example, I think that it is only about 10 years since it was built, and it is only 15 years after Kabi and Yachiyo-ku's feeding center, so I understand that it is a safe and secure food distribution, but I think that the number with this financial authority is neglected, and I do not have the financial plan, but I would like to ask you to explain it again.
○Chair Yuzo Yamaguchi, Director of Education and General Affairs, Manami.
◎ Director of Education and General Affairs Division (Kataka Manami) I’ve been thinking so far, but about 1330 million people, I’m considering which candidate sites are best in the selection of candidate sites in the review committee, so I’ll explain many times, but this is a matter of the review committee, and this is not a budget. It is said that it is well known among the review committee. I believe that I can provide safe and secure meals to children and children in Takanamachi who are responsible for the future in a very good way. Of course, I think of the financial plan that I was talking about now. In that case, I will change the budget again and again, but the order is based on 6 billion yen. However, the first point is that it is not old enough to have one or three centers, but the first point is that the food center of Nakamachi and the food center of the former Nakamachi were built in 1998. In addition, Kabi's feeding center is made in6 year 1994. The oldest restaurant in Yachiyo, Yachiyo’s feeding center is about 5 years. This Yachiyo's feeding center is a wet method, but it is a professional expression of non-contaminated areas, contaminated areas, and feeding, but it must be divided into contaminated areas and non-contaminated areas. For the installation of the latest feeding center, it is said that it is the best to separate the non-intersection method, so-called non-contaminated area, the contaminated area, the place to ship it, the place to supply the feeding. We don’t know that all of the three centers are matched. In connection with the food industry, we have rice feeding at Kabi's feeding center. We do not serve rice rice meals at the food center. 八千代 We also provide guidance from governments to promote rice feeding in local production. I think that it is good for children to integrate in this situation. More
◆No.12 (Y田da) Chair, No.12
○Chair (Yozo Yamaguchi) No.12, Mr. Yasuda
◆12 (Asayoshi Yasuda) I think that it is not necessarily the same as comparing with the provision of modernized safe and secure feeding. So this seems to be。ible, but I think that there are elements that should be rethinked in the basic concept of re-maining in three places, and then I think it is a very solid cons。 if I am a cons。, I, and conversely. I think that the basic numerals of the numbers that have been calculated are the minimum amount of 13.30 million yen, so I have expressed the highest amount of 15 billion and 16 billion yen, but if it is such a thing, it is that the numerals that the numerals that the supreme supreme supreme supreme supreme supreme supreme supreme. I think it is one of Japan’s leading cons、 rather than a cons、 I can give out now, but I think that the numbers that I have come out are not so sweet, but how about it?
○President (Yozo Yamaguchi)
◎Edu al Director (Kishihara Akiyoshi) It is a question of Mr. Yasuda, but I think that it is a little mis ing at this stage. The Board of Education has no idea that the budget is good. The budget is 630 million yen. However, if you choose a place and have all the facilities in place in the case of 3000 meals, it is said that it is 1 billion for the operator. So, I would like to consider things that are not necessary in this town, and things that fit in this town, and things that fit in the budget, so I think that it is enough to think that it is not giving misunderstandings a little, but I think that there are also things that are walking alone, so I would like to understand that it is not thinking more than the budget or doing it unorbited.
◆No.12 (Y田da) Chair, No.12
○Chair (Yozo Yamaguchi) No.12, Mr. Yasuda
◆No.12 (Soshio Yasuda) When you do so, is it planned as it is, and how many years is it planned for the実施 year?
○Chair Yuzo Yamaguchi, Director of Education and General Affairs, Manami.
◎ Director of Education and General Affairs Division (Kataka Manami) In this設計 year, we have planned the basic design for the 23rd year, construction in 24th year, and start of feeding from 25th year.
○Chair Yuzo Yamaguchi Manami. One-point, one-of-a-。 review meeting, including the previous three facilities.
◎ Director of Education and General Affairs Department (Kataka Manami) Initially, the review of the 3 Centers, which the members said, was actually a review meeting of public facilities, and the direction that the 3 Centers were integrated into the 1 Center was shown. Based on that, we are going to proceed with this plan, but in particular, it is said that it is a privilege to be a center, or it will be held at the three centers, and there are three directors of the predecessor and deputy department. This is one person in the future. Then, the other thing is that it is now done in barracks, I said earlier, but all of the towns are all allergic foods, such as Toh Harima and Kita Harima, which are special enough alternatives, and then removal meals. By making this line, I would like to have a dedicated。ritionist. This。ritionist is a staff of the prefecture, so it is not related to labor costs. By integrating the line, I think that it will reduce the number of staff, temporary staff and regular staff of the feeding center of 19 people. Initially, people are not decreasing in the form of relocation, but I think that the reduction of about 2 people will be sure. In the future, we will recr short-term temporary staff during the morning of the first lunch time, and we will take the steps to reduce people in the afternoon. I think that I was asked when I went to the east side of the U.S. in the early form, but I think that it can help to save labor costs and labor costs, etc.
◆No.12 (Y田da) Chair, No.12
○Chair (Yozo Yamaguchi) No.12, Mr. Yasuda
◆12 (Asayoshi Yasuda) It seems to be a bitter answer, but I think that it is not solved by labor cost. We will ask you if the return of the joint feeding with Nishiwaki city is completely impossible.
○President (Yozo Yamaguchi)
◎The Director of Education (Kishihara Sho-kun) There was a request that Mr. Nishiwaki agrees that there is Takana-machi from the person of Nishiwaki City. In response, I was considering how to do it as a takana town, but I decided to do it independently in Takana town. In Nishiwaki-shi, there is a part that consigns rice and other companies, and there are many differences between the things that Takana-machi is known. Therefore, I thought that it is impossible to do with Nishiwaki city. In addition, we presented it as a secretariat proposal in the construction review committee of the new food center, and we decided to do it alone. Restaurant
◆No.12 (Y田da) Chair, No.12
○Chair (Yozo Yamaguchi) No.12, Mr. Yasuda
◆No.12 (Y田sa) The library is also a town manager for the feeding center and seeks strong leadership of the educator. End the question.
○The answer to Mr. Yasuda was finished. Next is Kazuyoshi Ohnishi.
◆No.4 (Ichikun Onishi) No.4, Izumi Onishi We will ask the manager of the town and the educator about three points based on the notification. First of all, it is about the designated management system and leisure village park by question to the town manager. Is it necessary to abolish, integrate, and transfer the designated management facilities to be held in a responsible government? Because it is difficult to spend administrative expenses in the future, and management becomes difficult due to the decrease in population. It is necessary to be distracted by the management operation cost due to excessive facility. In addition, there are many facilities that will be reconstructed and facility renewal in the future, and the facility that was built on the basis of the success of the chief and the car society is difficult to use for children and the elderly. From the 90s to the time of maintenance and management of public facilities, if the box facility is indispensable for the local government, repair costs and renewables of the facility will occur. Therefore, we believe that the decommissioning is indispensable, and the residents must have a high priority, and we should supply a softディング for the maintenance of the facility that fits the length of the town. Next, in connection with Cocolon Naka, there was an announcement to transfer and transfer Hokurima Leisure Village Park to the town on November 9 as the second leather plan of the prefecture about the leisure village park facility. A park created for the use of local residents and local residents. Even though there are many users, it will be cut off if the financial is suffering. It is also a decision to prevent child-rearing and de子ing childbirth, and to communicate with the city. We will visit the town manager's perspective on the current situation and future direction of Nagoya, concentration, designated management facility and Kita Harima Jiyu Village Park. Next, it is a question that you need to interact from the settlement, and develop the environment. We will ask the manager. Prior to the formation of the Kita Harima settlement free zone, the agreement with Nishiwaki City is signed, securing the necessary living functions in the area, aiming to build measures to live a safe and comfortable life of residents. We believe that by taking a step, we will revitalize the region, energize and connect with settlement. Today, it is necessary to build measures that are not bound by conventional thinking, with the view of the severe current situation of the social economy. It is said that the town manager’s belief is that “We will revitalize the exchange of cities and rural villages” and “We will promote the local community through the increase of inbound customers,” but I think that it is exactly the point. In addition, I would like to ask you about how to interact with leisure villages. We will ask the third point, the chief of education and the chief of the town. Barrier-free Grand Design Seismic-resistant measures that are almost completed in Ta-Kancho, as the earthquake-resistant school facility protects children's lives. It is the responsibility of the local government to create an environment where children can work on exercise and study with peace of mind. Therefore, there is a current situation that must be questioned about the inside of whether the safety and security that are more closely aligned with the life by looking at the foot in the future. In recent years, it seems that the school and public facilities have become an easy-to-act environment when children with disabilities and the elderly are studying and seeing visitors. It is a barrier, and the three elements "stack", "toilet", and "elevator" can be considered. We need a grand design that can correspond to these requirements. Therefore, we think that it is necessary to improve the obstacles from the点 of people with disabilities and participation in society. In addition, it is necessary to quickly respond to the washlet of multipurpose toilets in public facilities, but it is necessary to look at the head of education and town manager.
○Chair (Yozo Yamaguchi) Mr. Toda.
◎We have received three questions from the town manager (Toda Zenki-kun). Designated management facilities and leisure village park. Then, exchange from the settlement, the environment maintenance. It is a barrier-free grand design. First, second, and first of all, I will answer the questions and answer them from the Board of Education and General Affairs. First of all, it is a way of thinking about a designated management facility, but we have a similar idea. It is the biggest challenge to think about how to get softディング quickly to the facility that fits the length of your life in the town. As mentioned by the Board of Directors, this designated management facility must be considered for abolition, integration, and transfer in the future. However, the basic concept is not only a designated management facility, but also a facility that is essential for the entire town. Is it possible to earn independently if it is a regional revitalization facility? In case of a facility that requires large-scale renovation, it is important to verify whether it is good to update, and to identify the direction. At the office, we hold a public facility review meeting. I started to study in this office building. It is a situation to consider the use of the site of the recreation facility, and the future of the facility that requires large-scale renovation within the next 10 years. In addition, we plan to create and evaluate the evaluation sheet of facility maintenance management including designated management facilities in the business evaluation. It is the place to get ready. By this way, we first classify public facilities by nature from the viewpoint of necessity and utility, and consider the direction of the public facility of the entire town, along with absolute evaluation of office business. About Kita Harima Leisure Village Park The same question is immediately followed by Mr. Fujimoto who also submitted it, so if you are a member of Mr. Onishi, we will respond from the position as a town and ask Mr. Fujimoto about how to think about it as a prefecture. First of all, the Hokurima Leisure Village Park was built in 62 with 13 hectares of land as the center facility for recreational use of the Kita Harima region. In addition to the viewing zone and adventure hiroba, I thought that it was positioned as a large city park in the town level equipped with Kocolon Naka. Although it is a situation that the use of it is reduced, it is also a facility with a proven track record that it can be entered in about 110,000 per year. It is positioned as a facility to be abolished by the second line of leather plan of this prefecture, and it will be that each municipality, this facility and Takanamachi are, but it is assumed that it will be transferred if Takanamachi is desired. It is assumed that the local use rate is high for the decommissioning and transfer of the prefecture, but it is 13% of the use rate of Ta-Kan Town people in Leisure Village Park. In addition, it is said that the facilities in the park are managed by the local city, and the locality is strong. However, there are some places where you can see that the whole park is strong because there is only one facility in Cocolon Naka. Even if it is seen from the prefecture, even in small urban parks, I think that it is true that it is not enough to be considered as a large urban park in the town of Takana, which is targeted for transfer. In the future of Leisure Village Park, I honestly have no idea at all. There is no formal explanation. On December 28th, I would like to thank you for your understanding. As a town, I think that it is a situation that I can not raise awareness that I can not receive at this stage. I will continue to adjust with the prefecture, and I think that you will probably be talking about such a story as soon as you next year. It is a place that I want to continue to want to operate strongly depending on the prefecture. The second question is. I think there is a question that the part of the city farming village will increase through exchange. We are always looking forward to welcoming you to Takanamachi. It is located within 1 hour and half hours from Kobe and Osaka, and I will always promote Takanamachi in the countryside closest to the city. In addition, we also use the expression of the entrance of the countryside as well as PR. I think that it is important to sell Takana town by making the best use of the local interest of the countryside closest to this city. There are many people who visit Ta-Kancho, which is attracted by the wonderful nature, the air and the beauty of the water. Let’s work together to create a town with people who are busy. In addition, it is a place to promote exchange business with urban rural villages by connecting with business opportunities. We also have accommodation facilities such as Froiden Yachiyo in Yachiyo Ward. It is an intrinsic meaning so that you can take it to a large deployment so that you can continue the part of the city even further in the old Yachiyo town ahead of the main building, but I want to use the intention. In addition, I would like to bring the case of success to other three facilities and teach them. I think. Hyogo Tourism Vision is established in Hyogo Prefecture. Based on that, we have been engaged in attracting customers with the name of "Aida Hyogo Tourism Campaign". In addition, the Kita-Harima Prefectural Bureau and the Kita-Harima Regional Tourism Council have launched the Kita-Harima 15 million exchange plan, aiming to increase the annual average of 500,000 tourists. We work together with the local government to achieve this. In the future, we will cooperate with Kita-Harima's "Heart Nigutto Kita-Harima" business by Kita-Harima Prefectural Bureau, and we will cooperate with private bus companies, and we will plan bus tours centering on tourism exchange association. It is the establishment of an exchange facility and an exchange base of the Kita-Harima Leisure Village Park. However, it is a place that I would like to continue in the prefecture and cooperate with the aim of fulfilling in the town as I thought that the current two facilities, Yoshiro Village Park and Cocolon Naka. I don’t know whether it is difficult to adjust. I don't know if it is. Thank you for your understanding.
○President (Yozo Yamaguchi)
◎Edu。 chief (Kishihara Akiyoshi) We will answer questions about barrier-free grand design. The earthquake-proofing of the school facilities in Ta-Kancho is to complete all elementary and junior high schools in the next。 year. This is about the barrier-freeization of school facilities, but this is based on the school facility maintenance guidelines and school facility barrier-free promotion guidelines issued by the Ministry of Education, Culture, Sports, Science and Technology. As a result, the installation of multipurpose restrooms and elevators for wheelchairs is progressing. However, there are schools that meet the standards of seismic isolation and do not require seismic isolation, and there are schools that have not yet been解消 of steps and are not going to be equipped with multipurpose toilets and elevators. For multipurpose toilets, there are 9 elementary and junior high schools in town and 5 elevators. In addition, we have four multipurpose toilets for cleaning toilets and washlets. In addition, there is a multipurpose toilet for both the library and the Naka Fureaikan where the educational committee is located. It is a place for children to learn and live as well as to be a base for local education and culture, and if a disaster occurs, it will be a shelter. For this reason, it is necessary to be an easy-to-use facility for elderly and disabled people. We believe that it is necessary to plan and promote barrier-free access, such as step-by-step maintenance as necessary while considering financial aspects. We will respond to other public facilities from the General Affairs Division. Thank you for your understanding.
Director, General Affairs Division, Mr. Kanda
◎ General Affairs Division (Kanda Masaichi) It is a relationship of barrier-free public facilities, but the public facilities in the town are the main facilities except the school lunch center etc. First of all, the first step is the difference, but the number of 17 facilities is 88%. After that, the second multipurpose toilet was washleted. However, 4 facilities were unresolved, so the cancellation rate is 76%. It is the third elevator, but 3 of the 7 facilities are unresolved, so the cancellation rate is 57%. It is not enough as it is said to be a member because it is this number in the main facility. In the future, we would like to consider the facility which has a remodeling plan of the main body in the near future.
◆Chairperson No.4
○Chair (Yozo Yamaguchi) No.4, Onishi.
◆No.4 (Ichiyoshi Onishi) So I would like to ask questions from the first question. The designated management facility is currently designated as 29 facilities. Management fee of 20 years is 116 million yen. In FY22, we calculated the budget book. It is a little bit about 116 million yen. Is there any criteria for this designated management fee? I think it is impossible to set the standard to 0, but I will ask about the point whether it is thought to include such direction as how to shrink and become independent.
Mr. Ono, Manager of Management Planning Division, Yuzo Yamaguchi
◎ Director of Management Planning Division (Humiku Ono) Therefore, I would like to reply to the request for the designated management fee. By the way, it is a designated management fee for FY22, but it is JPY 178873,000. Of course, I think that the basic idea of the designated management fee is to balance income and enditure as there is from the previous one.町 them, the point to consider is to have a certain condition as a town. For example, for facilities that have a deductive effect, the deductible amount must be compensated in the designated management fee. In consideration of such a situation, the designated management fee is calculated, and it is the same as the designated management fee for the specified expiration period every year, but in our case, we are negotiating annually by seeing the financial situation in consultation with the administrator, or as the designated management fee that specified the upper limit is not possible to reduce by financial situation. Sorry, this entry is only available in Japanese. More
◆Chairperson No.4
○Chair: Yuzo Yamaguchi, No.4, Kazu Ohnishi.
◆4 (Onishi Ichiyoshi-kun) This is the situation that the person who is entrusted will be able to do so without any見通しs, but it is not the last one that is piled up every year, but it is not such a place to this side.
Mr. Ono, Manager of Management Planning Division, Yuzo Yamaguchi
◎Management planning department manager (Humiku Ono) Basically, even if you can not set the age of the year, the town manager has changed earlier, and I am still doing a big amount at this time, so I should not return to the original point of how to exist in the town facility without the designated administrator system, so I would like to quickly consider the so-called facility from two points. Of course, by making an absolute evaluation of the maintenance and management of so-called public facilities, the method of the facility in a visible form is calculated, and how the facility has direction, including private transfer, but the direction of the facility is urgently urgent, and now, is the facility really necessary for the townspeople and the region? In addition, I would like you to decide the policy in conjunction with the part of whether there is a publicity as a region.
◆Chairperson No.4
○Chair (Yozo Yamaguchi) No.4, Onishi.
◆No.4 (Ichiyoshi Onishi) I will hear one of the answers of the current chief, but in the first place it is managed by this designated administrator and such facilities, but simply manage the facility. Which is the reason why you want to create a local community as a base for your facility?
Mr. Ono, Manager of Management Planning Division, Yuzo Yamaguchi
◎Management planning department manager (Humiku Ono) The idea of a traditional designated management facility is still open, including private sector, so it may be a conventional way to maintain and manage the facility. However, it may have been a way to improve the service by doing so. However, in our town, one public facility is a facility that can 活性化 the locality in the town. Therefore, we would like to guide the improvement of the locality and the contribution to the region from the following。 year, while maintaining profitability in the meeting with the designated management facility in 1 and 2 years. Therefore, we would like to fully talk about this point for future hearings, etc. how much the facility itself can bring to the region.
◆Chairperson No.4
○Chair (Yozo Yamaguchi) No.4, Onishi.
◆No.4 (Dainishi Ichiyoshi-kun) I think that it is very important to make the local community as a base, but there is a facility called Satoyama City of Nagomi, but there is also a management diagnosis here, and after that I am suffering from a variety of things, can you tell me a little about the current situation?
Mr. Ono, Manager of Management Planning Division, Yuzo Yamaguchi
◎Management Planning Division Director (Humiku Ono) Nagomi-no-Sato is designated and managed by the Daiwa Activation Exchange Association. In the past two years, there was a little difficult financially in the management of the association, but we were able to manage it in the form of a replacement of the facility manager. As a result, the current situation is a joint exchange meeting with the accommodation facility, and the exchange with the local community that we are aware of, it is the creation of an image character by the tie-up with Yachiyo Nishi Elementary School. It is not understood that the results of the end of the22 year are not seen, but it is financially a very good direction, and the current situation is that the local people actively engage with the city and rural village.
◆Chairperson No.4
○Chair (Yozo Yamaguchi) No.4, Onishi.
◆No.4 (Ichiyo Onishi) In the fact that the management guidance of the Satoyama city of this garbage has been improved, there is also a revitalization of the area and regional development, but there is no meaning if it does not exist, so I will ask here for example, about 26 。s, this part is, but this is because this is running by 8 people, each facility has a management fee of tens of millions, but one thing is that there is no sense of commercial sales. Even if it is a problem that it is good to be thorough, management policy that is always stuck in the town, this is why it is necessary to change after all. What about this area?
Mr. Ono, Manager of Management Planning Division, Yuzo Yamaguchi
◎ Director of Management Planning Division (Humiku Ono) We have paid a designated management fee of over 17,000 million yen. We are looking forward to your understanding that we have paid a designated management fee of 70 million yen, and we are looking for in more than 200 towns. However, there is a part that says that there was a sweet face until now about the point of profitability, whether it is said to be the commercial sales. The reason for this is that the so-called management diagnosis, and follow-up, which we have been admitted two years ago, is to understand the management situation, and to have the importance of the management, so that the entire organization can take care of such a commercial sense, but it is the current state that we are proud to be a town-施設 facility.
◆No.4 (Isuki Onishi) Chairperson
○Chair (Yozo Yamaguchi) No.4, Onishi.
◆No.4 (Ichiyo Onishi) This is the end of this problem, but I would like to try to make such a proposal, but this is what if you take such a management system about the tens of facilities after removing the facilities of 29 facilities, NSI and people with disabilities, but if you did not do this pyramid-type management, you need to make a system that is able to trust and have the power of it, and you need to make this guidance or distribution. There are a lot of people in this area, but I think that it is difficult to get out of it unless I take this step somewhere and grow such a thing and make a new business owner change.
Mr. Ono, Manager of Management Planning Division, Yuzo Yamaguchi
◎ Director of Management Planning Division (Humiku Ono) The point of speaking of the member is fully understood, and of course, based on that matter, we are doing such follow-up as a management diagnosis now. However, I would like to have a management planning department in the direction of such guidance while making efforts to raise talented managers that have been said to now. Also, I would like to establish a system to provide information that is able to demonstrate the management ability aiming for independent arithmetic.
◆No.4 (Isuki Onishi) Chairperson
○Chair (Yozo Yamaguchi) No.4, Onishi.
◆4 (Onishi Ichikyou) It is about the park of leisure village, but I received a town chief, the answer now, but I think there is a trekking that I will be happy to receive a transfer. It’s a 惑endous thing, and it’s a bit confusing, but I’m sure there’s a 13-town walk, so what about it?
○Chair (Yozo Yamaguchi) Mr. Toda.
◎Machi-cho (Toda Zenki-kun) There is no admission fee. Free admission So, when you get a new admission fee, can you get it as a town? If you think about how much attracting customers can expect when you take it together, it is likely that you will be able to get a new burden group. The prefecture is managed and red. It seems we can’t find what you’re looking for. For example, if you are told to give it more than this money and manage it, I will understand that it is transferring with the story of the stage that you can cut the amount. I don’t know what kind of story I can take on on 28th, but I think it is difficult to understand that it is not a story that can be received easily.
◆No.4 (Isuki Onishi) Chairperson
○Chair (Yozo Yamaguchi) No.4, Onishi.
◆If you are the 4th (Ichiyoshi Onishi), you will choose the existing facility after all and concentrate. I would like to ask for this. For example, it is free when you come to the park for 30,000 people per year. It’s free to come. The most common thing is that it is the people of Ta-Kan Town, so it is also very lonely if the local residents use it, and this is the one at the foot of the Mt. Myomi, which is very lonely if there is no such thing, and it has been growing lively in the old town period. So, I would like you to take the weight of the choice and concentration firmly, so I would like you to look forward to it on 28th. Next, it is a minute from the settlement, but it is difficult to settle after all, so I would like to ask the question where there is no need to improve the current situation because it is not necessary to take measures to deepen exchange and increase. First of all, I had a response to the chief of the town, but this facility can respond even if it is called. It may be said that the facility will be made again, but for example, there is one thing that there is a problem because there is no such place where you can handle it because two buses came to this Takanamachi. In other words, it is a restaurant or a toilet, and there is one situation that only one unit can be accommodated. Then, there is no such part that guides tourist information and visitors. You can ask where to go, but it is in the office. This situation is very troublesome. For example, this tourist facility is closed on Mondays, Tuesdays, and Wednesdays. If there is a person in charge at the office, it is possible to respond only to trees and gold, so I think that this part is really a part of the tourist guide, so I will transfer the staff to the outside facility and I will concentrate on it. I think that there is no such kind service, so it is not possible to enter.
○Chair (Yozo Yamaguchi) Mr. Toda.
◎Machi-cho (Toda Yoshiki) Firstly, I think that it is exactly what I have pointed out. Is there a lot of space to eat by bus? If you think, I think that it is impossible to respond to a large number of people that only Air Leben, Edel and that area. Even though it is possible to respond to the roadside station, I think that it can only be about the medium bus. It is the relationship of the toilet as I said, but this is because I can only respond to the facility that I am thinking about now, so I think this is the biggest problem and I. Or, it is a part of the sightseeing guidance that I was talking about one after one. I will go to the office on Saturdays and Sundays, but when there are various events, it is a great question. It is an honest fact that the staff who are coming to this occasion are responding. For example, this is a tourist exchange association. So, it is a place where I have the recognition that the situation of being able to guide you in a prominent place must be made earlier. We understand the issues we need to deal with.
◆No.4 (Isuki Onishi) Chairperson
○Chair (Yozo Yamaguchi) No.4, Onishi.
◆No.4 (Ichiyo Onishi) It is the end of the second, but if you come from the outside, you will be able to receive a service. However, if there is a thing called a tourist information center as it was, if there is a staff who is resident there, or if other people are hired there, it is said that I will send information while coordinating the facility and tourist information of the entire town. Above all, I think that you shouldn’t be able to make things that have been acting on the basis of the subsidy until now, and then you shouldn’t be able to make a tailor to the tourist company. I would like to work with you in the future by establishing a guide office and securing a person who has or can transmit information in it. However, I will move to the answers of the educator. I think this grand design is barrier-free. It is not necessary or not, but the era of such things as integration in the current society, the way we live together, because we need to do this is too much, and people who have no need to do this are the same. In this sense, it means that school and public facilities are the easiest to do. 10 schools There is a tuition, but there is a。ible school. That’s why we don’t know what it’s like, but we’re also going to have a vocabulary for older people today, so we don’t have to deal with it because there’s a disability. It is said that the barrier is also proposed by the public institution by trying to take it from the facility, so I understand it so that first, when I look at this school, the toilet is also a washlet, but it is almost not. There is also a step. There is no request until the 2nd and 3rd floors, but I think that the first floor should be the first. We will ask the educator to answer again.
○President (Yozo Yamaguchi)
◎Edu。 Director (Kishihara Sho-kun) We have visited each school twice a year, and we have been looking at the facility so that it is safe and secure. In that case, we are looking for a request from the staff, and the request is not rising, but we are working on the maintenance while thinking about where we need to write. Because there is such a situation as much as possible, I think that this school has been doing this for many years, and I would like to continue to plan by examining how it was done after all.
◆No.4 (Isuki Onishi) Chairperson
○Chair (Yozo Yamaguchi) No.4, Onishi.
◆4 (Onishi Ichiyoshi) It is the last question, but I think that I am, I think that Kabi Junior High School, this school is very well organized in various aspects. I think it is a good school. On the other hand, if you look at Matsui Elementary School, this is also面ible, and it is said to be a primary school. I would like to thank you for your understanding that it is dark and different, and it is very strict. I think like this. Why?
○President (Yozo Yamaguchi)
◎Edu al Director (Kishihara Aki-ku) I was told the name of the school first. As a result of visiting the school by the Board of Education, we are thinking that the toilet of Matsui Elementary School and the step difference are enough. {{ item.start datetime }}
◆No.4 (Isuki Onishi) Chairperson
○Chair (Yozo Yamaguchi) No.4, Onishi.
◆No.4 (Ichiyoshi Onishi) Children and education are very important, and they become children and adults whose education is based on education and make the world. I will ask you by doing this. Close
○The answer to the chairman (Yozo Yamaguchi) Mr. Onishi was finished. We will rest for a while. (11:00am) (11:00am)
○Chair (Yozo Yamaguchi) Then we will reopen the meeting. Next, Hidemi Fujimoto.
◆3 (Eizo Fujimoto) Seat 3, Fujimoto Please contact us for more information. In the previous question, I have been very busy with the answer of the town manager, but I do not know how to duplicate the same question, but I would like to ask you. The article of the 2nd new line of leather was published in the Kobe Shimbun on November 19th. The following four urban parks are transferred to each city. First of all, Seibuko Park, Akashi Nishi Park, Jinryodai Greenland, and Prefectural Leisure Village Park in Makino, Naka-ku, and Nature Park Kasagata as a facility, this is the policy of transferring to each city. If there is no negotiating with the city, it was a strong article that decommissioned parks and facilities in 2011. Is it true? In fact, have you been negotiating with the prefecture? The area of the Yoshiro Village Park is about 13ha and it is about 10 Osaka Domes. For 24 years from 62 to today, Hyogo Prefecture has managed and operated by 6 employees with a 30,000 million yen per year. In 2009, it is about 126,000 people per year. In addition, there are Japanese gardens, rose gardens, iris gardens, 200 m stooling tables, and a number of play equipment. It is a park that is popular with children and young parents as an exchange place for old and young people. We are looking forward to seeing you again, but how do you think of the vast park as a town? In addition, I heard that there was a notification that the facility of Nature Park Kasagiri Kobo, cottage 3 buildings, campsites, and about 1800m2 will be transferred to the town several years ago, but how do you think about the施設 of transfer? Contact Us Next, I will ask you about the integration of childhood. Two kindergartens and two nurseries in Kami Ward are integrated from the coming spring, and Kami Kids Land is being constructed in a rapid pitch just for the opening. I think it is a recruitment stage that already has an admission briefing. In this way, both Yachiyo-ku and Kabi-ku, preschool children's education will become a child's land system. In the report of the Ministry of Education, Culture, Sports, Science and Technology of the Ministry of Health, Labour and Welfare of the Ministry of Education, Culture, Sports, Science and Technology of the Ministry of Health, Labour and Welfare of the Ministry of Health, Labour and Welfare. My father and mother are expecting a facility to keep my child safe for a long time. In Naka Ward, there is a kindergarten and a private nursery school in the town, but in the future, we will ask you how to think about preschool child education in Naka Ward. More
◎We have two questions from Mr. Eizo Fujimoto. We will respond to the relationship between the first point, the Prefectural Leisure Village Park and Nature Park Kasagata from me, and we will respond to the method and concept of promotion in the middle section of the Kids Land. First of all, I would like to thank you for your understanding as we have responded to Mr. Daisei. It is a two-in-one facility, but it is very close to the second new administrative structure of the prefecture, how to promote financial structure reform, and so-called new leather plan, which is why Kita-Harima Yoshiro Village Park has a high local utilization rate, and this is only 13%. It is positioned as a small city park with strong locality such as the town manages the facilities in the park. In addition, there is Kasagatayama Nature Park Center and Nature Park Kasagata, but the town is operated as a designated administrator. The facility is deprecated as a facility where the same type of facility is maintained in the prefecture. It is about the policy of this prefecture, but the intention of the town is not completely pumped. This new leather, and the previous year, the new leather plan was issued for 21 years, but in the direction of transfer to the city and transfer, we proceeded to discuss and examine, and in principle, we were disco。ed. 21 years It is not a sufficient consultation after that, and there is a doubt that this is a method of honesty about this. As for Hokurima’s leisure village park, it is a facility that pays more than 30 million yen per year. The management of the management of the management of the management of the management of the management to receive the transfer of the town is no more honest. It is important to consider how the town can manage with 30 million yen or less because the prefecture is managed and it takes 30 million yen. On the other hand, if the prefecture is said to be in town, it may be a contrary that it is necessary to confirm how to manage the operation. Sorry, this entry is only available in Japanese. It is a story that will be officially sent to you for the first time in the 28th. I would like to be aware that the part of the media comes out first. However, I don’t have any misunderstandings, so I think I’m also a member of the Onishi Council, but I think I’ll continue to manage it in the prefecture. That’s why it’s continued in the prefecture. So, the town will do the effort to attract customers. As a result, I try to make a pushback to do administrative operations in the prefecture, so I think that it will be disco ed immediately, and that part is the future story and I myself, and the town has answered the question immediately. Although the prefecture is talking like that, I think that it is our role to make efforts so as not to do so, so I would like to understand it a little. For the nature park center and Nature Park of Kasagatayama, there is a course that we have asked the prefecture to renovate the facility due to the deterioration of aging. However, it is true that there is no one improvement. In addition, if you do not make a decision with the local Nature Park Kasagata Exchange Association which has real management, you can not answer only the town. We are not trying to decide to transfer both facilities at present. Enough adjustment is required. I would like to answer this question. We have two facilities, but we think that it is impossible to transfer, and we think that it is a problem that we will adjust in town and prefecture with the intention of the prefecture. The second question will be answered by the educator.
○President (Yozo Yamaguchi)
◎Edu、al Director (Kishihara Sho-ku) So, now, it is a question that Mr. Fujimoto asked questions about kindergartens and nursery schools in Naka Ward, and how to do it in the future. Currently, there are two facilities, the preschool of the Ministry of Education, Culture, Sports, Science and Technology, and the preschool of the Ministry of Health, Labour and Welfare. However, it is a facility that has a common role in both kindergartens and nurseries in terms of childcare and education through play,環境ing the environment according to growth and development for children before school. In April of this year, the data is increasing by about 20,000 people. Fortunately, there is no such thing as a waiting child, but in this situation, we have established a certification child garden system in October 2006. In addition, we are planning to introduce a new system of child and child rearing to help children grow and support child rearing in society. How do you go for preschool education and childcare? It is a place where the movement of this movement is now being considered as an eye. Based on the movements of such countries, the needs of parents, and the challenges that we are currently facing, we have 7 committees until now. Parents, supporters for parenting, and school officials. What kind of childcare services do you offer in Takanamachi? In addition, I am considering how to make a child as a takana town. For kindergartens and nursery schools in Naka-ku, there are currently 1 public kindergartens and 3 private nurseries. There is a facility with different operation requirements. In Yachiyo-ku, Kabi-ku, we are planning an integrated facility called Kids Land Yachiyo and Kids Land Kami. However, in Naka-ku, there is a situation that such operation is different, so it is very difficult to do the same as Kabi-ku and Yachiyo-ku. In this way, it is a problem of how to take preschool education, childcare, nursery school, and kindergarten in Naka-ku, but it is considered by the preschool education and childcare review committee that we are currently doing while respecting the wishes of three nurseries and parents. By the summer, I have received various opinions in the review committee, and how to do it as a town. In summer, there will be a response from the review committee, so I would like to express it in this町 year and make a direction as a town. Thank you for your understanding.
◆No.3 (Eizo Fujimoto) Chair, No.3
○Chair (Yozo Yamaguchi) No.3, Mr. Fujimoto
◆No.3 (Eizo Fujimoto) It is the first leisure village park in the past, but on November 19th the newspaper was announced, and the first time I received a description of transfer from Hyogo Prefecture, but there are many people in the region and outside the town. Therefore, I think that you should be a predecessor of the prefecture, and if you want to transfer such a way of transfer as a town, or if you want to transfer it, you should be a predecessor of such a thing, but how do you think about it?
○Chair (Yozo Yamaguchi) Mr. Toda.
◎Machi-cho (Toda Yoshiki) In the stage indicated, the intention of the newspaper is already conveyed. We are responding in the first stage of our service. In response, I also expressed the opinion that we will be in trouble, and I understand that the push back again is 28 days. I would like to thank you for your understanding.
◆No.3 (Eizo Fujimoto) Chair, No.3
○Chair (Yozo Yamaguchi) No.3, Mr. Fujimoto
◆No.3 (Eizo Fujimoto) On the 1st of December, the general教 and textile committee reported the results of the Takanamachi In。 Reform Plan.町ing that, when the Deputy Director negotiated in the story of the relocation of Yosoi-mura Park, Tamba City also talks about the relocation problem and wants to wear the table, but the North Harima Resident Zone Concept also signed a agreement, so how about negotiating such as Nishiwaki, or Ka崎-cho?
Mr. Takao Kokoda, Vice-chō, Yuzo Yamaguchi
◎ Deputy Director (Takao Kokoda) I would like to say that in the seat of the committee. This is the way of the prefecture. So, under the recognition that there are a lot of customers in Takana town, it is a policy to go to Takanamachi to return this leisure village park. However, it is the utilization rate of 13% of the town, and the actual situation is between Hanshin and the neighboring Tanba city, but I can say that there are many use of other towns, so I try to push back with the recognition of the prefecture is slightly different. That’s why it’s a bit different to maintain and manage this facility alone in Takanamachi, so it’s time to maintain and manage the facility together with the prefecture in Hagari. In this park, I would like to continue to exist as a town, and I would like to express my message in cooperation with other cities. Restaurant
◆No.3 (Eizo Fujimoto) Chair, No.3
○Chair (Yozo Yamaguchi) No.3, Mr. Fujimoto
◆No.3 (Eizo Fujimoto) I would like to give you a strong . On December 9th, the Moyanagiyama of Kurodasho-cho, Nishiwaki City, has signed an agreement with the distributor of the beverage company. It is an agreement that the company that is responsible for the conservation and management of forests is to make branching, lowering, and working processes for free. You may not be able to do 100%, but you can also find a company to cooperate with. If you are trying to find such a cooperative company at the foot of Mt. Myomi, or if you are transferring to the town, I think that it will be less expensive, but how do you think about it? Are you thinking about such a movement in the future? Contact Us
○Chair (Yozo Yamaguchi) Mr. Toda.
◎ Mr. Yoshiki Toda gave me the story of Mr. Ishikawa. We are also asked by people living in Nishiwaki. It is a place that we have thought that we were able to make a precedent example of "Kawasaki Heavy Industries no trash forest" more than that. It is a similar idea. In addition to its leisure village park, I would like to further recr。 companies who can support them by working in the Greening Promotion Council. However, there is a negotiating course in the future about the story of the Yosoi-mura Park, so I think that it will be a story from the point of view, so I think that I have avoided the answer right now.
◆No.3 (Eizo Fujimoto) Chair, No.3
○Chair (Yozo Yamaguchi) No.3, Mr. Fujimoto
◆No.3 (Eizo Fujimoto) Indeed, residents are strongly encouraged to continue the leisure village park, so I would like to think about how to transfer the condition strongly. It’s Nature Park Kasagata, but if you visit the local area, we will talk with the managers, you will be able to see 10,000 people outside the town every year. And, I would like to have three employees at all times. In particular, I asked a complaint about the toilet, the exterior of the building, and the public phone, so I would like to go to the town directly to the prefecture, but I have written a document to the prefecture, but it is very troublesome because I can not go to the office easily.
Mr. Ono, Manager of Management Planning Division, Yuzo Yamaguchi
◎ Director of Management Planning Division (Humiku Ono) Nature Park Kasagata is said to be true in the other day, so I asked the officers of the association to talk about it, because it turns all designated management facilities including this transfer problem. As mentioned above, we have been asking for a long time since 2 or 3 years ago. Although we are fully aware of the facts for the prefectures, we would like to revisit the facility repairs of Nature Park itself as well as the reconstruction of the facility.
◆No.3 (Eizo Fujimoto) Chair, No.3
○Chair (Yozo Yamaguchi) No.3, Mr. Fujimoto
◆No.3 (Eizo Fujimoto) Please come and try it. Lastly, in the general question of December last year, the executor would like to continue to exchange opinions with the teachers and managers of the private nursery school, but it is really difficult to make this direction in July. I would like to check it.
○President (Yozo Yamaguchi)
◎Edu al Director (Kishihara Aki-kun) I would like to raise a reply by summer in the review committee of preschool education and childcare in Takanacho as I said earlier. We would like to express the direction of the town as a town with the preschool education and childcare in Naka-ku. Thank you for your understanding.
◆No.3 (Eizo Fujimoto) Chair, No.3
○Chair (Yozo Yamaguchi) No.3, Mr. Fujimoto
◆3 (Eizo Fujimoto) I would like to ask for a childcare fee related to this. The childcare center and the kindergarten are 2000 yen round-trip for those who use the bus from next year. However, the childcare fee of 5 years old is 1 to 11 stages, and income tax is 12.3, and the price is much same as this, but it is said that the childcare center and the kindergarten are 2000 yen round-trip.
○Chair (Yamaguchi Yuzo) Mr. Fujimoto, as usual, it is too far away, so we will allow you to do so when you can answer.
○Chair (Yamaguchi Yuzoku)
◎Child's Future Division Director (Masashin Echikawa) will be rude. I had a question from Mr. Fujimoto, but in the direction of eliminating childcare at a child-care facility, the direction of the review committee was made. In addition, the person who had selected the childcare in kindergarten was entrusted to the nursery office, and it was set up with the desire to increase the burden as much as possible, especially in children aged 5 years. The price of the kindergarten in Naka-ku and the total amount of childcare is JPY 16500. This is the cheapest price in the third section. We decided the upper limit as a special case according to it, and we decided to set the fee by suppressing the町enditure of the sudden townspeople. I think that the entrance briefing was October, November, and November 13th, but I will do it in three sections, and I will explain the detailed information carefully to parents such as comparison of other cities, comparison of childcare fees, and comparison of service charges. As a result, we do not ask you to have any opinions on each venue. Therefore, I think that parents have a general understanding. More
○Please ask Mr. Fujimoto to ask questions in the notification.
◆No.3 (Eizo Fujimoto) It will be the last, but it is very important to have a child education so that the spirit of Mitsuko is up to 100, and it is also the era of childization, so I would like to have a careful and time-consuming childcare and preschool education in Naka-ku, so I will ask for questions. Thank you very much.
○The answer to Mr. Fujimoto was finished. We will take a break for a while. (11:00am) (13:00pm)
○Chair (Yozo Yamaguchi) Then we will reopen the meeting. Next, Kunimasa Yamaguchi.
◆10 (Kunimasa Yamaguchi) No.10, Kunmasa Yamaguchi I have received the permission of the Chair, so I will ask questions based on the notification. We will ask questions about human resource development of staff and residents. We believe that it is an important issue not only for companies but also local governments. Therefore, we will ask questions from the training of staff and the training of residents about human resources in Takanamachi. The environment surrounding local municipalities, such as de ing birthrate, regional decentralization, and financial closeness, is increasing。orously on a day. I think that it is not an ex。ation to improve the qualities of the staff in such a way that depends on the future of the town. Improving each individual’s qualities can also improve the skills of the entire town administration. Then, I think that the town’s comprehensive strength will be increased by that, and I will go to the town where I want to live with high residents’ satisfaction. Although the finances are getting close to each municipality in the region, I think that it is necessary for the town’s staff to行動, creativity and behavior for less money backing. I think that it is a town where people can practice, think about themselves, and act. Therefore, we will first ask you how to position staff training and how to do it. I think that it is important to increase individual qualities by going out to the outside of Takanamachi and receiving training with other municipalities and other organizations. Is it possible for those who wish to participate in the training as much as possible and for those who are ex tant to the training? I think that it is important to actively support staff who wish to receive training in a voluntary manner. I have recently participated in a variety of trainings and lectures, and I am looking forward to掲載 the internet and newspapers. We listen to various people, meet with people from all over the world, and have a valuable experience. Training and lectures are held in various groups, universities, etc. I think that there are many people who are trained and trained independently among staff. In addition, I would like to receive it, but it may be a person who is hesitant in time. I think that it is necessary for participants to take time-consuming considerations such as public service, and financial aid for tuition fees. For example, if you want to study the whole town, you will study the direction of welfare. I think that it should be aid in such a case. This is also good for those who study at home using communication education. If you study the contents related to the town administration, it will be a plus for the town. How do you like? In the fourth point, we believe that human resource development should be active even if the current budget is increased. It is believed that it will be a big property even for small amounts, and it will be effective for the administrative operation of the city. I think that investing in people generates great value. And in the promotion of new public, residents will become a great force in town development as well as staff. For example, if you wish to participate in volunteer group management or community development training, we should establish a human resource development system and provide financial support for training. Thank you for your understanding.
◎We have received a question about one of the town managers (Mr. Yoshiki Toda) Mr. Yamaguchi, about human resource development of staff and residents. It may be a good idea to reply as you say, but I think that I will do a reply according to the item that I contacted. Before that, I think that improvement of the qualities of each person leads to the skill improvement of the entire town administration. And that’s exactly what I think of this recognition that the new era of public is doing so far. This is the training of staff, but we have about 40 people participating in the training program organized by seven organizations such as the prefecture’s autonomy training center every year. The contents are training by job title and subject training. In addition to this, we are located within this office, but it is a place where all staff members have human rights problems, basic regulations of town development, the financial situation of the town, and the problems that the town is currently facing. It is the position and direction of the first town staff training, but the training is human development. As I said now, we aim to develop staff who can respond to problems with new ideas that are not caught in the previous example, by expressing the rich humanity and high 観ics as a public official. It is important to get things that are not in itself by interacting with other city staff. We understand that most of the training includes content that can exchange opinions, etc. Every year, we are going to inform all employees of the training that is scheduled for the研修 year in April and ask them for the first time. In addition, it is recommended that employees who have not studied the list of trainees in the past take priority. It is support for the third program training, but as a town, it is self-payment and there is no assistance. We are trying to improve the level of the entire staff. In addition, there is also an adjustment of the work in the department for training on the work outside of the staff, so it is the principle of obtaining the consent of the affiliation. We support the increase in the fourth training budget and resident training, but in cooperation with residents, the town staff will improve their qualities through town development, local revitalization, etc., and give them a notice to residents and organizations. I think that if you can create a town together, it will be the ideal shape. In the case of residents studying, it is possible to ask a local instructor in support of village development activities, and the training is accepted in the farmland and water conservation measures business, so it is important to think about it if you use it. First of all, we will ask you to answer the question again.
◆No.10 (Kunimasa Yamaguchi) Chair, No.10
○Chair (Yozo Yamaguchi) No.10, Mr. Yamaguchi
◆10 (Kunimasa Yamaguchi) I think that the first and second answers to my thoughts, but I would like to ask one of the staffs, but what is the cost of the year that I take for staff training?
Director, General Affairs Division, Mr. Kanda
◎ General Affairs Division Manager (Mr. Masaichi Kanda) The expenses related to staff training are about 8 million yen.
◆No.10 (Kunimasa Yamaguchi) Chair, No.10
○Chair (Yozo Yamaguchi) No.10, Mr. Yamaguchi
◆10 (Kunimasa Yamaguchi) I mentioned in the current question, but this employee training is 8 million yen, but for example, is it enough to understand the residents? If you can improve the quality of the staff of the town, you will be able to understand well, but do you think that the contents of the training are sufficient?
Director, General Affairs Division, Mr. Kanda
◎ General Affairs Division Manager (Kanda Masaichi-kun) After all, the staff is doing it in a limited number of people, so it is about 40 people per year, but there is a desire to do it as much as possible, but I want to do this if I can, but I would like to consider the method that I can not use as much money as possible. It is a very important problem as it is said, so I would like to go proactively, thank you.
◆No.10 (Kunimasa Yamaguchi) Chair, No.10
○Chair (Yozo Yamaguchi) No.10, Mr. Yamaguchi
◆10 (Kunimasa Yamaguchi) I think that it is also the time of the organization of the budget, so I would like to take care of the training that employees would like to spend a little more money on training. In addition, I think that it is important to have an external, especially voluntary training, but in the previous answer, I was asking for self-paying, but I think that it is necessary to consider a financial aid or a way to take a vacation in the workplace.
Director, General Affairs Division, Mr. Kanda
◎ Director of General Affairs Division (Masaichi Kanda) We do not take any responsibility for personal training. However, for example, if you hear the prefecture, it is a small amount of money for a year if you want to study something if you are a group of three or more people after 5 o'clock, but there is a situation that you are auxiliary to the limit.
◆No.10 (Kunimasa Yamaguchi) Chair, No.10
○Chair (Yozo Yamaguchi) No.10, Mr. Yamaguchi
◆10 (Kunimasa Yamaguchi) The most important point for human resource development is to learn self-study or self-study without pushing it here and participating in the training. I think it should be a support for the staff who are thinking about doing so, thinking about learning new knowledge and thinking, and trying to improve their skills. There is a thing that you can take horses to the water side, but you can not drink water on horses that are not drinking water. For employees who want to learn, learn, and grow themselves, I would like to raise them without picking the 芽s for those who want to study indirectly.
○Chair (Yozo Yamaguchi) Mr. Toda.
◎Machi-cho (Toda Zenki-ku) Director General Affairs Division also answered, but first, I think that studying is what I own. So, I would like to express my sincere respect to the members and the members of Yamaguchi. And we are very sorry about the recommendation of how to make a more fulfillment in budget. However, it is natural that you must use it effectively because it is a limited source. I think it would be a good idea if there is no way to learn. And there are various courses, but there are also salary. I think that it is good because it is a ス that I take in a private sense because it corresponds in that. However, if there is an influence in the part of the work in that lesson when there is a staff who want to learn, I think that it is difficult to have a shared relationship to help everyone. It is about a month ago, but there was a training about the so-called local staff at Kyoto University. I joined it, but I wanted to say honestly that I would like to go with it. However, there is a difficult problem in the world of public officials. It is necessary to maintain it. So, I went with the staff of the department in charge, but it was a problem that I thought that I had to organize some contradictions here that I could not be able to be open and together. I have various training opportunities. So, there is an opportunity to hear stories of various experts. I think I can say everything. I will take all notes to all employees, so I can send mail in the consciousness of sharing. There are 40 people on the contrary, so I don’t say all 40 people, but I think that it should be an ingenuity to tell other staff if they had a very money training. However, I would like to consider sharing the results of the training report meeting. In any case, I would like to look at the attitude that I will do about the study itself. Thank you for your understanding.
◆No.10 (Kunimasa Yamaguchi) Chair, No.10
○Chair (Yozo Yamaguchi) No.10, Mr. Yamaguchi
◆No.10 (Kunimasa Yamaguchi) It feels very severe in terms of self-payment, but I would like to create an environment that is easy to leave the workplace even if it is not small. I would like you to prepare such an environment where you can send out to the staff you want in the workplace. It is a support system for the residents of the last four points, but there was a story that it can be used in the farmland and the part of the water. Therefore, I would like you to think about such support for residents who are out of the frame.
○Chair (Yozo Yamaguchi) Mr. Toda.
◎Machi-cho (Toda Yoshiki) First, I think that the support of the residents is of course, for example, various fields, but there is a university of life creation. There are also universities for older people. We have a lot of financial resources to take lectures on the part of the program. In this way, we support learning. In addition to that, but we are thinking about it now, for example, disaster victims are accepted by residents in each village. This is to support the expenses in the town, but it is also supported by the parliament. However, since we have rudders in the direction of the city, I think that it is likely to be placed in mind where to spread the field again. This part is not me, but I would like to respond positively if there is a need.
○The answer to Mr. Yamaguchi was finished. Next, Kosumi Kadowaki.
◆No.9 (Kyosumi Monwaki) I will be rude. Seats 9 and gate side. We will ask two questions based on the notification. First, we will ask about measures to reduce population. According to the estimate of the National Institute of Social Security and Population Problems, the population in Japan began to decrease to 12.73 million peaks in December 2004. And now, in the middle of the middle of the northern part of Hyogo prefecture, the rapid population decline has faced a major problem that will shake the future of the town of population decline and ultra-aging society. It is expected that the population of Hyogo prefecture will decrease more than 50,000 every year. As shown in Table 4 of Materials 1, more than 280 people per year have been decreased in 5 years after the merger. According to the Hyogo Prefectural Government’s 資料 materials, Takana-cho is expected to be 19000 in 2025 after 15 years. In the recent estimate, it has already cut 20,000 people and has become 22899 people. In addition, the aging rate, which occupies the entire population of 65 years or older, is about 28%, and the population composition of 2010 in the city of Takay、 is the table 3 of the material 1, but it is expected that it will accelerate in the future, and the aging rate will be 49% in the 10 years. After 25 years in Japan, it seems to be more than 60% of the elderly lives in town villages. It seems that there will be a town that becomes a hot topic, "I saw children today" when I saw young children. In addition, in the village of Ta-Kancho, there is a serious problem such as the district where there is no elementary school student, the family with no youth or successor, and a few married people with young people. I think it is necessary to recognize that population decline is not a distant future problem, but it is now a crisis. In addition to economic scale reduction, the rapid aging of s、ptors decreases the社会 of social security systems, such as 、s, and the management foundation of the local government is in。 weakened. How to stop population decline? Even in the election of the Ama崎 City Hall this year, this problem becomes a major confrontation, and the election is also seen as a public agreement. Therefore, we will ask questions about the issues of counter s for the de子ing childization that Takanamachi has been working until now and the efforts to counter s for future population growth. We will ask you about the town’s efforts on the measures to increase population by I-turn, and U-turn, which is the hometown. Last year, we have signed a cooperation agreement with Kobe University, and the report has been submitted in September this year. How do we publicize it and utilize it? 2、It is important to attract companies to stop population decline and create 。 by local industry development, but I think that the efforts are not enough. We will ask who is in charge of what kind of effort is made, such as cooperation and attracting with biomass town concept. In addition, the project of yukata using Banshu-ori is ongoing between the Noma Textile Industry Association and the Arima Onsen Association. What kind of support is the town for the development of the local industry? 3, 30 to 34 years of unmarried rate is 47% for men at 2005, and 32% for women. Although it is said that the marriage support society is a de子ing measure, how do you take measures to support marriage? 4. The average birth rate from 2001 to 2005 in Ta-Kancho is 1.52, and the population is said to be reduced if there is no total special birth rate of 2 or more, but we ask the chief of the town about the efforts to reduce the population decline. Next, we will ask you about the improvement of the service and effective use of the comibus. Every year there is an amendment or improvement in the operation of the comibus, and the passengers are gradually increasing. However, the air bus condition continues as usual, except for direct flights to Nishiwaki and multi-high school buses. In order to maintain this route bus every year and to operate the comibus, we have issued tax and subsidy for about 1840 million yen for the maintenance of the route, about 4060 million yen for the comibus auxiliary, about 492 million yen for the subsidy. Is it necessary to keep a large amount of tax every year for the maintenance of public transportation in the Nakayama area and for traffic weaknesses? I think it is necessary to think about the effective utilization method of the comibus by promoting more administrative reform. By the way, according to Hyogo Prefecture’s new leather plan, the 20th year formula, we instruct some reviews of the comibus’s survival and abolition. In case of bus support, the average boarding density is 2 or more than 15 people. In addition to the average daily operation of 10 times or less, two or more average transport will be added, and the limit of 11/20 will be set, aiming to improve the management efficiency of the local bus. 2、For the general support project subsidy of the comibus operation, the prefecture is reduced to one-。rd of the current prefecture and city from one-町rd to one-。rd of the prefecture, the city is changed to two-。rd of the city, and it is carried out from FY2011. In addition, since there is a low part of the Orihime bus of Nishiwaki, it is to stop at the end of November 2010. In addition, the agreement on the formation of the North Harima Resident Zone linked with Nishiwaki City, it is said to support the maintenance and strengthening of the local public transportation network and support the operators for the maintenance of the bus route. So, is the comibus operation business right? We will ask you about the improvement. There are two routes: two direct flights to Nishiwaki and one course Iwaza-jin. There is no need for 11 books per day for high school students. In addition, there are many courses from Tsukigahana to Takasaki High School. How about connecting them to Nishiwaki? Subsidies seem to be duplicated. 2、The 21 subsidy of the difference amount has become Ta-Kancho, and it has been 4 times more than 4 times since it was 1121 million yen in 2005. Currently, the town is 100 yen, and the west side is 200 yen. Is it good for high school students who are weak in traffic and elderly people who are used occasionally? In order to reduce grants, it is necessary to review the price. There are three routes with one average ride rate in 2010. The average daily average is 8 and 9 people. 0.8 people last year on average. I think that it should be considered to change or improve as it is 1.2 people this year. I think that it is necessary to connect to Nishiwaki city and Kurodasho, where students to multi-high school, to make effective use of the three-course comibus. It is also matched with the self-reliance zone concept with Nishiwaki City, and I think that it is possible to cooperate and support some financial support, so I think that it should be negotiated with Nishiwaki City as soon as possible. 5、Nogiku bus timetable is 100 yen in town and 200 yen for west side. I think it should be clearly stated and promoted more. In any case, it is essential to improve the operation of a comibus that costs more than 10 million yen every year for the prevention of global warming, and it is necessary to review the course, review the flight, review the price, reduce the subsidy, and make effective use. We ask for the thoughts of the chief of the town, including how to make future public transportation.
◎We have received two questions from Mr. Toda Yoshiki. It is about the operation of the comibus after the rapid measures to the population decline society. I will answer the problem of population decline, and I will reply to you first, and the relationship of the comibus will be a little fine, so I will reply from the chief of the charge. It was the year of the Seto Inland Sea. I was most honestly worried that the population of 20,000 thousand will be able to see where. It was my expectation that it would be worth 20,000 thousand. However, this is a thrust meter, which is a population estimate of 22899, which was pointed out by the current member of the Kadowaki. So, I have received a report that I could clear 2.3 thousand. It will be officially announced around February, but I think that the number of 20,000 thousand hundred will probably be shown. In addition, this was also pointed out by a member, but it is the relationship of aging rate. I think that it will become an aging rate of。 28%. I never know that aging is a problem. I think it is difficult for the elderly to pick up healthy and longevity. The problem of population is that the ratio of so-called productivity and production age population is very condensed, so I would like to have a little touch of it that aging is never a problem. It was a little bit surprised, but I saw the newspaper yesterday, it was a book center of Tokyo, this Yaesu, but the book that I sold the best was a book called "2030 super-aged future" and this book is the best selling, and I was very surprised. I also ordered a bookstore a little more now and asked me to read what book. We will answer your questions. First of all, I gave guidance to Associate Professor Fujioka in cooperation with Kobe University. This is a different initiative in each district, but we have been promoting guidance, but Kabi-ku has been conducting research on reversal population movement. It is a report that you see. I think that it is served to the chief of each Kami Ward. In addition, I think that it is also distributed to the directors of the ward council. I think that the behavior that triggers I-turn is the best thing for both men and women. In addition, it is the reason for the hometown of U-turn, but I think that it is almost half of the answer that protects the dependent and inherited land of my parents. Therefore, first of all, we would like to consider the need for wide-area activities and initiatives to create a place for encounters that triggered marriages, and this is also highly appreciated for the business that the Shokokai Youth Department is working on. This is the new organization in December. I would like to think about it. Next, I asked Dr. Fujioka to visit U-turn. It is a place where you can read from the report that such situation will continue to be able to find a job in a high school city, but I think that it is impossible to think about something that can be both working in Keihanshin and child-rearing in Takanamachi, and we recognize that improving commuting access is a major issue. In addition, it is a new form of work that I said now, but it is called FTTH, but I would like to promote it widely that the so-called IT environment is perfect. After that, I would like to touch the questions of the members of the previous meeting, but there is one common point for those who come to U-turn. If you are involved in the events of each village, or when you are small in the business of the village, it is the part that you can do U-turn. On the contrary, I think that how to make a village to the current child, how to get involved in the village events, how to make a mechanism, how to increase the U-turn people, and how it is said to be an early step. I would like to connect the system of employees to each village, and I would like to continue my efforts to be able to do it. It is the relationship of the utilization of biomass, but we also cooperate with local governments, university professors, urban NPO organizations, etc., and we are studying the development of sales channels and business expansion of wood chips. In addition, we are also talking about cooperation and attracting with biomass related companies. It is a situation of such a spect , so it may be too expensive. As there is an excellent factory site in the town, I would like to continue to actively attract. Even though I don’t know yet, I always try to talk about it. And it is difficult for companies to come to Takanamachi and ask for what is the most important thing. There is also a story of the polarizer, but I can’t touch it now. I would like to express my gra。 to you that we are doing our work in charge. In addition, we have established a corporate location plan in FY20 as a way to attract companies, protect local industries and promote local economy. Contact Us We will revise the special regulations for promoting industrial locations in FY21. In22 2017, we have been working to improve the quality of our business, such as tax exemptions, etc., and in産業 2017, we have been working on the development of conditions by specifying industrial consolidation promotion districts. We have been計画redited by 6 companies and submit plans for scale expansion. In addition, we have formulated this year's action plan to promote the next generation development support measures in Takanamachi. We are committed to promoting this kind of business in the fields of support for marriage. This is a business that targets men and women living in rural areas where Hyogo Prefecture can go, and promotes exchange between members through various games, mini events, etc. Mr. Kawaki said that the activities of the Shokokai Youth Club and the activities of the Hyogo Prefecture's new Hyogo Children's Future Plan are supported by the business that is being held in the support of marriage. In addition, Hyogo Prefecture has been developing a new project to support the marriage activities of unmarried men and women this year. On this month, the Hyogo Encounter Support Center business was started by jointly between Hyogo and youth headquarters. This is a business that provides opportunities for people living and working in Hyogo. Kita Harima Encounter Support Center is located on the second floor of Kato Shopping Park. Tokamachi, I would like to actively utilize various businesses in the prefecture that utilize the scale benefits so that people who want to be married can meet more people and meet rich people. Therefore, I think that it is important to thoroughly understand the system by conducting PR activities, etc. to the town office in some cases. In addition, the development of this concrete is very difficult, but I also have the thought that it is good to have a revival of the local section. It seems that it has become a situation that must be in a policy. Because there is a personal information, if you are a local person, you know that it is from a small time, so there is a reason that there is no problem with the privacy of the employees. It is recognized that the resurrection of grilling a sashimi is important for those who are pregnant. In addition, I think that the marriage agency has a big key for the improvement of birth rate. I think that the marriage agency is the first stage and the second stage to improve birth rate. We hope that the first stage and second stage will be able to expand on the extension line, so that the registered business etc. will be married with a new encounter. With new support, I would like to draw such an image so that I can say Takanacho if I live, if I want to parent. There are many other ways to support. It may be a good idea to say that all measures are true, but it is also true that how to develop vacant house business, and so on, such as child-rearing support business and nursery schools. I think that it is important to be able to demonstrate the strengths of Ta-Kancho in Niigata Prefecture, and to make public relations in the form of a business meeting something. It is not enough answer, but it is very difficult. And if the town that worked positively on this issue is alive, the recognition is fully made, so I would like you to do sharp measures and responses. The second point and the relationship of the comibus will be answered from the chief of the department in charge who has been increasing.
Mr. Yoshida, Director of Regional Development Division, Yuzo Yamaguchi
◎Regional Development Division Director (Ichiyo Yoshida) I will be disappointed. We have doubted that the operation improvement and effective use of the comibus. In November 2003, the community bus and bus service were launched in the former Nakamachi area. After that, we will organize six courses in four courses. The course is set as a route from the Takanamachi Office to the Takanamachi Library. We have changed the route from Nagano in Xi'an to Nissin red again because the connecting taxi has been inconvenient in terms of transfer and reservation. In addition, we have also launched a weekday operation for the Nishiwaki-shi station from Yamaguchi, Kami-ku, for high school students. As far as possible, we have changed the setting of the course. The purpose of the introduction of the comibus is to maintain the local bus, which is the core of the public transportation of the town, along with the measures for traffic weaknesses as a welfare measure. In order to achieve this purpose, we are working carefully using various systems operated by the country and the prefecture. First of all, it is about the first point of the point of the point, but two direct buses from Kami-ku Yamaguchi to Nishiwaki Line, this is a comibus. We have added one route bus for rainy days as a Rainy Bus. However, it is difficult to get on the bus in Naka-ku, so many users are running as a comibus. On the other hand, it is a one-course comibus from Iwaza-jin to Takanamachi library, but it is a route to Takanamachi office and library through other parts such as Iwaza-jin in Kabi-ku, Tsubakama, Okuarata, Yamanobe, and Nishiwaki. The center of this course is the main user of the hospital to the medical institutions of Matsuisho Clinic, Nissin Hospital and Naka Ward. There are differences between two route users. In addition, although it is related to the route bus, the main road is the route. It is a public transportation blank area as a route. Although it is normal to avoid duplicate routes, it is possible to set up duplicate routes, but if you think that the convenience of the user is priority, it seems to be inconvenient to make a single Nishiwaki line. In addition, there is no subsidy that the cost of maintaining the route bus and the difference of the 。 are compensated, and the commissioned service of the comibus, and the contents are duplicated. Next, I will discuss the difference 。 subsidy system, but I am currently discussing the 。 issue in the Regional Public Transportation Activation Council. As the member pointed out, the difference grant system is a system that increases the burden of the town if the number of users increases. We discuss the burden of beneficiaries according to convenience. However, as many of our users are high school students and elderly people, we believe that it is necessary to avoid that the user will be reduced by increasing the value and the survival of the bus. I would like to consider it in conjunction with the introduction of IC cards and commuting schedules that increase convenience. Next, the third user is about the low comibus route, but I think that it is a problem as pointed out about the route that assigns an average of one person per unit. 3The course is applicable, but if the local user is low, it is difficult to maintain the course. There is also an increase in users. I want to see a little more. The 4th Kurodasho area is a ride, but it is a place where you can request from the PTA of the high school, crossing Ishiharazaka as an improvement plan of the 3 courses with low usage. Nishiwaki City also has a similar request. So, we have discussed several times. However, Nishiwaki City has not received positive responses considering the impact of other high school students. In addition to the const ent self-reliance vision, the maintenance and enhancement of the regional public transportation network is a big pillar of the agreement. We would like to continue to negotiate and negotiate the construction of a public transportation network with high convenience including route buses and comibuses to Nishiwaki City. Note that there is no charge on the 5th and the timetable. This is a situation in which the 、 is discussed as a question as previously, and it is not stated from the judgment that the user knows. Please edit the timetable with priority on convenience when using the bus, including connecting JR and express bus. Thank you for your understanding. There are more than 170,000 people including bus and bus service. In order to maintain public transportation and welfare measures for people with weak traffic, I would like to use the system of the country and the prefecture, as well as cooperate with the transportation service of the welfare department, to reduce expenses. Thank you.
◆No.9 (Kyosumi Monwaki) Chair, No.9
○Chair (Yamaguchi Yuzoku) No.9, Kenwaki.
◆No.9 (Kyosumi Monwaki) In addition, we have received a response such as improvement of the birth rate in 5 years ago, and the question of counter s for population growth. However, even after 4 years or half years, I still have a big progress, so I can ask again. So, first of all, how do you use the agreement with Mr. Fujioka or Mr. Nakagawa with the first Kobe university? But there was no answer, so how do you make such an announcement?
Mr. Yoshida, Director of Regional Development Division, Yuzo Yamaguchi
◎In the survey of Dr. Fujioka and Dr. Nakagawa, the chief of the Regional Development Division (Issshiro Yoshida), we have been conducting research in the form of the reflux population of Kami-ku, as we had previously responded to the town manager. So, we distribute all of the ward managers in Kabi-ku. Of course, we are also serving as a member of the Board of Directors. Therefore, if necessary, it is also possible to reprint, but it is currently in such a situation.
◆No.9 (Kyosumi Monwaki) Chair, No.9
○Chair (Yamaguchi Yuzoku) No.9, Kenwaki.
◆No.9 (Kamewaki Yukisumi) I would like to make it easier to understand and announce it to the townspeople. Therefore, I think that there are three points that are the points of the research report. One is to provide and secure , the second is to provide and secure cheap housing, and the third is to interact with the local community, and there are three points. Therefore, we have shown to you in the document 1 and we have written it before this panel, but firstly, if we look at the relationship between birth rate and m ality, the number of births is around 160, the number of deaths exceeds 270, and about 110 people decrease by birth and death. In addition, there is an average transfer of 420 people, but there are about 600 people. 280 to 290 people in total So, what should I do to invoke I-Turn or U-Turn to settled, so if you look at the required conditions from the report of Dr. Fujioka, the first thing is to create by attracting companies. 14% of creation by local industry. In addition, there are a lot of public facilities such as transportation access, hospital, etc., and the construction of an open society, but I think that it is important to ensure 。 without saying anything. So, how to ensure youth’s work and , but I’ve decided how many times I want to work for companies 4 years ago and 5 years ago, but I’m sure that the town’s office was 6 places asked by the ward manager. However, I have received a response that I feel that I have already entered the stage of attracting companies rather than the company location, but I can not see a big progress after that. For example, I asked who is in charge of the department, but there was no answer. Which departments are you in charge?
○Chair (Yozo Yamaguchi) Mr. Toda.
◎The town manager (Toda Yoshiki) The relationship of attracting companies is a very difficult issue. Because of the enhancement of , the recognition of this part, which must be done hard is natural. We are in charge. For that reason, we have a part of the promotion of commerce. I think that it is enough because it is the room. It is here.
◆No.9 (Kyosumi Monwaki) Chair, No.9
○Chair (Yamaguchi Yuzoku) No.9, Kenwaki.
◆No.9 (Kyosumi Monwaki) I also pointed out in front of this, but there were only two commerce relations among the main measures of the Industrial Promotion Division. Only two of the 35 items are actually one. There are five items in one place, and you don’t know who is in charge. In particular, for example, what kind of company s are attracting companies, or who is participating in industrial exhibitions, or who is actually participating in such a place, will become familiar with companies. or change business cards to introduce the town. In addition, you may have pointed out that you have to go to a memorable company and make a human pulse and connect it to a corporate attracting, but have you done that?
Mr. Hirobata, Director of Industrial Promotion Division, Yuzo Yamaguchi
◎ Director of Industrial Promotion Division (Mr. Masahiro Hirobata) It is noted that there are only two main measures, but we report the major measures based on the style of budget and financial results review. There are a lot of activities that are not directly involved in the budget for this company attracting, so it is the content that you narrow down to the two items that are noted in the summary of the budget and financial report. In fact, we have been increasing in the past, but it is a place where we communicate closely with related organizations such as the Commerce and Industry Association.
◆No.9 (Kyosumi Monwaki) Chair, No.9
○Chair (Yamaguchi Yuzoku) No.9, Kenwaki.
◆No.9 (Kyosumi Monwaki) It is about the effective use of vacant house, but in front of this, there were hundreds of vacant house banks in Kyotango City and Ayabe City in Kyoto as one of the council reforms. Of course, there are dozens of real estates that can be purchased and sold in that area, but there are very free houses at this time. There are more houses that have no successor in the elderly, or alone. I think that it is necessary to make effective use of these measures to increase population, especially when you recall young people to Takanamachi, but please report how much free house investigation is currently.
○President (Yozo Yamaguchi) Is it a notification?
◆No.9 (Kyosumi Monwaki)
○Chair (Yozo Yamaguchi) Yes
◆No.9 (Kyosumi Monwaki) Yes, this is.
○Chair (Yamaguchi Yuzoku) Mr. Kadowaki, communicating with you only. Please ask questions.
◆No.9 (Kyosumi Monwaki) It narrows the focus. There are a lot of them, but at the end of the day, I asked them to conduct a questionnaire on bus school. This panel is written in 2. Although it is difficult to see in the back, it is from Nishiwaki city, but there are both Kurodasho and Nishiwaki. However, at present, it is very high by going to the bus school, and it takes 六 yen to 1500 yen. Especially in winter, it is difficult to pass a girl's child from darkness. So, when I surveyed a questionnaire, there were 94 people who want to go to Nishiwaki City and Kuroda Sho. In fact, there is a hope that high school students who go up from 82% to 83%, and if you can, you want to go to bus if it is about 200 yen. What do you think about this?
○Chair (Yozo Yamaguchi) Mr. Toda.
◎Machi-cho (Toda Zenki-ku) It is a question now, but I have received this answer so far. In response to the request from a high school, we have been making many of the requests that Mr. Nishiwaki would like to have similar measures. I also investigate how Kuroda Sho can connect from JR station of Kurodasho. It should be delicious. I would like you to see a full list of minutes.
◆No.9 (Kyosumi Monwaki) Chair, No.9
○Chair (Yamaguchi Yuzoku) No.9, Kenwaki.
◆No.9 (Kyosumi Kadowaki) It will be longer time, so I would like to negotiate with Nishiwaki City by all means. Thank you for your understanding.
○The answer to the chairman (Yamaguchi Yuzo) Mr. Kadowaki was finished. We will take a break. (2:03 p.m.) (2:15 p.m.)
○Chair (Yozo Yamaguchi) Then, we will reopen the meeting. Next, I went to Takazawa.
◆No.8 (Eiko Takazawa) So, I would like to ask the manager of the town and the related department for the issue of the procurement of wood related to Kids Land Kami new construction, and the installation of shika meat processing facility. First of all, it is about the procurement of wood related to Kids Land Kami new construction. I will explain about the contents and details, but I think that this problem is cleared up as a trouble between a業者 company, but I think this problem happened to happen. And these series of events suggest many things. I think that I have given a lesson to the above, so I will ask the manager and related manager by looking for the mechanism of problem occurrence. In the new construction of Kids Land Kami, it is one of the purposes to promote the use of local wood. This is to use the wood produced in the town as much as possible in the bidding specification, namely, from Takanamachi, and the supplier of wood is designated as T可 District Wood Cooperative. It seems that the majority of the products raised by the multi-country timber cooperatives, with the order of structural materials from the Morita-Imanaka special enterprise cooperative, which is contracted by this specification, is approximately a house and two large houses. In this section, we use it as a trouble between the company and as a structural material in the air, such as a window frame, for example, a problem has been dropped and cleaned up, but is it good? In the sour of wood, even if you look from the seam, it was a place where the production in the town was impossible from the beginning, starting from the construction and the completion period. It seems that the viewers of the people concerned might be. However, as a result, we received an order from Morita and Imanaka, and we were working to become a symbolic wooden facility in the area. We were working to make a work to consistently deliver it to Morita and Imanaka, as long as we could faithfully conform to the bid specifications. However, at the end of the inspection to commercialize the original wood, we changed the company that was originally planned. I had to change. The problem has occurred from here. In the background of the change of the company, there is the fact that the wood union has been requested by the wood union to deliver to Morita and Imanaka through the productization and inspection by Kiei Co., Ltd., which was subcontracted by carpenters from Morita and Imanaka. As a result, although most of the structural materials that should be procured with responsibility were commercialized, it is not possible to use for食 food, etc. Our wood prosperity procures and supplies shortages. This is a structured material that was produced by the un wood cooperative. I float in the air as I thought before. If this is only a problem, it may be cleared up. But I would like to add this. Previously, Imanaka Morita’s office where the wood union visited the meeting of the wood delivery was also seated. “I’ve been preparing wood since November last year, and I’ve already enjoyed wood in August.” This is a testimony of the timber cooperative association and the Tanba Forestry Promotion Center. Is this a good meeting information? Because of this, the wood union remained uneasy about the delivery, but after that, Morita Imanaka has received a specification of structural material order, and we have made efforts to deliver wood in the delivery time. However, anxiety has become reality, and the majority of the wood produced through the wood prosperity has not been used together with the un印ed mark. This is a problem that is happening now. I said at the beginning, but I think it is necessary to say that this is a problem that occurred inevitably in a certain way. Use a merger special bond without the basic plan to be the root of the new Kami Kids Land business and business. Because there was a fair subsidy, there was no subsidy. In addition, there is no intention to move forward even though the design cost was measured at the budget of last year. This is not enough. I have repeatedly pointed out the problem about how to proceed and the business itself, but this problem occurred in wood procurement. I think that a lot of problems have been hidden. These are not only contractors of construction and related companies, but are the problems of the town that is the source of the order, and the cause is the beginning of the way to proceed the construction, and I think that it is caused by the speed. I would like to ask you how the town is taking this event and where the problem was. From this event, you will see the challenges that need to be re-examined and constructed, such as how to proceed with the construction, outsour、 business, how to place an order, how to engage with a contractor, how to have a staff organization, and how to manage information and internal control systems. So how did this happen first? I think that it should start with the clarification of the situation and factor analysis, but how is it considered? I think that it is necessary to identify and analyze the situation thoroughly, and to make and verify the verification team that is not only the party but also the third party. Next about the installation of shika meat processing facility. The establishment of a shika meat processing facility was carried out in the agreement with Nishiwaki City and the establishment of a self-reliance zone plan, and the investigation and diagnosis were published in this October. The report was created in December of last year, but there was no report in this September. And when will the announcement be announced in October? Now the condition setting for the installation of the processing facility was completed. After that, we only calculate the budget. It seems that you can see such a town authority, but you may want to clearly indicate that you want to hear before the budget is recorded. It must be noted. What is the problem of setting up facilities? Also, let us know how to clear the issue until it is installed. And then, the significance and basics of building a facility are for residents. So, I think the town should be shown to us. 。 the establishment of a shika meat processing facility is really meaningful for towns, towns, and groups, there is a preparation to show a compelling data plan to the towns. For more information, please contact the town manager. First of all, I would like to ask you about Kids Land.
○Chair (Yozo Yamaguchi) Mr. Toda.
◎Machicho (Toda Yoshiki) 2 questions. We will respond to the relationship of the first childland from the manager of the charge and the deputy head of the town. We will answer your questions about the construction of the second shika meat processing facility. First of all, it is a problem of facility installation. Bird damage to agriculture and forest products has increased rapidly. The number of traffic accidents is increasing. I think it is necessary to proactively expand the use of shika meat after capturing and capture. In particular, after establishing the Hyogo Forest Animal Research Center, we have been actively engaged in research on wildlife ecosystems, promotion of wide-area system enhancement, spreading to each city and farmers, and practical guidance. In a private facility, there is a Hime Momiji in Tamba City as a sika meat processing specialty facility, and it is already open. It is a problem in the utilization of shika meat, but we have been coached that it is important to focus on sales after processing, and we are doing special product development research with the cooperation of the people of the local specialty processing club, and aim to expand sales channels. In the取 year of21 year 21, we received a report from a subcontractor to conduct a survey of the need and business evaluation, improvement of profitability, and reduction of financial burden. December 2017 On the other hand, we are preparing to formulate guidelines for sika meat processing in Hyogo Prefecture. I heard that it was in such a situation in聞いて. In addition, I would like to understand that the parliament report was judged on the 25th of October, even though it was overlapping with the preparation investigation time in the area related to the processing facility system. We will never be delayed. In the report, the management of a facility that駐s a person is pointed out that the handling of 200 heads per year is a loss. In the number of captured heads in the town, if you understand that the number of heads that can be processed is about half from the current situation, it will be a problem that this is not how to do it. In Hyogo Prefecture, we conducted surveys on the establishment and consumption of the兵庫県-Friends Group, which is the center of the友-Friends Association, and the expansion of sales channels between Hanshin. In addition, it is a place that actively cooperates with the research of utilization by the local organization such as the food drink association. I would like to cooperate effectively and solve problems. It is the significance of the shika meat processing facility, but there is a problem that is practically environmental. When you enter the mountain, you will see a lot of de。s. It is said that the situation that children can not be put in the mountain is going to happen in Kabi Ward. And, it is true that the request of the disassembly processing part can not be processed somewhere hygienic. We are a member of the Hunting Friendship Association, the農 Chairman's Association, the ward meeting, and the processing club. However, we have a dedicated discussion. It is said that it is necessary for hygienic processing facility maintenance. In addition, we have qualifications necessary for the operation of the processing facility among the members of Hunting Friends, and we have a request for a small facility of 50 employees per year that can be processed mainly by加工 on Saturdays and Sundays. In addition, we are considering it where we received the request to consider including the use of free public facilities. There are issues such as catching system and sales surface, but I think that it is necessary to maintain it first from a small facility that does not reside people in the facility and connect it to the next step while doing it. We had a meeting with staff. I heard that the staff who are in the said that the car and the sika are treated on the second day. I hear that there are three situations in one day. The most common is Kabi-ku. We also report that the origin of the Yachiyo Ward is the most frequent traffic accident. It is common both by recognition that it is really a problem related to life during pregnancy. I want to start small and start to verify whether it is really a business start. In the case of shika, I heard that about one-。rd of the captured head can be used as a so-called meat. In the future, 50 small-scale areas have not been established as a management problem, and it has become more important to put people. In such a situation, I will try to make routes and sales channels first. Therefore, we would like to first verify the part that it is possible to expand. After that, if you want to make use of it in the part, we have taken a two-stage thinking that you want to start the next step of the approach in the form of riding a management base. We will answer your questions.
○Chair (Yamaguchi Yuzoku)
◎Child's Future Division Director (Shoshin Echikawa) How did the town accept the wood procurement related to the new construction work of the Kids Land, and think that there was a problem? After that, I asked about how to proceed for future construction and how to place an order. I would like to reply in order. First of all, this construction is decided by the design company in March, the bid auction in July, and the bid auction of the bidder in August, and the bid of the construction will be approved by the council on August 25. There are three points that Ta-Kancho, the owner of this construction, requests the contractor for wood. First of all, the use of wood from Hyogo Prefecture is 70% or more as a supplementary business partner. The second point is that it has the structure, type 2, type and type, and grade 3 standard. In the third place, the construction is carried out so that the construction completion and delivery of the work on March 11, 2011 can be done. These three are the requirements for the woods of this business and are intended for the construction of safe and secure facilities. Mr. Takazawa's question is that wood is now tuned to deliver the timber sour。 immediately after the contract by Morita Kosakuten and Imanaka Special Co., Ltd. After the construction order, Takanamachi and I have been working on the use of wood produced in the town while maintaining the construction period and quality. Even if you are a contractor, we have been striving for the use of wood produced in the town with the instructions of the town, but the construction contract is expressed in Article 1. For this reason, it is a contractual problem that the orderer Takanacho is involved in the procurement of materials at the responsibility of the contractor in terms of terms of work period, quality, etc., and we will continue to do our best, but I would like to understand that we can not do the instruction. For the procurement of timber, please understand that it is the place where the procedure is filled with the three requirements that we first obtained. We will continue to provide you with information on how to proceed for future construction and how to place an order. This construction is a large-scale construction work that supports the forest forestry emergency maintenance business, and it takes as much as possible to design, order, and construction management as a town. First, we introduced a design proposal method that evaluates excellent proposals and implementation system at the design stage, and selected a design company. In addition, after the selection of design firms, we established a construction project team of related departments with a top technical supervision, including the deputy manager and the educator, and conducted 8 consultations for employees. In the next stage of the order, we made three new initiatives as Takanamachi. First of all, we are hiring a specific construction joint company system. This was adopted to make it easier for locally savvy companies to participate, and the result was that the local Kami-ku Inaka constructed as a communicator. The second is the design book distribution from the homepage of Takanamachi. In the past, design books that were only viewed at the office can be obtained from the net early in the early stages, and it was difficult to examine the detailed construction system. The third was a technical proposal based on the theme of short-term construction using pre。ural materials as a bid condition. By clarifying the problems of construction, the thoughts of the orderer were sent to the contractor. In addition, in consideration of information management and internal control system, Mr. Eiko Taka talks about in the current construction management stage, the project team's department remains intact. In addition, in order to cover professional technical aspects, we are conducting construction and management of the design and construction management contract. As a town, we take measures as much as possible depending on the purpose and issues of construction, order construction, and construction management. More
◆No.8 (Eiko Takazawa) Chair, No.8
○Chair (Yamaguchi Yuzo) No. 8, Mr. Takazawa
◆No.8 (Eiko Takazawa) Now, when I ordered it, I explained it carefully, but I had such a problem, it is not only the kids land in which the town is going to be, but it is also a question that there is a problem that you have to think about in such a way that the town is going to order in construction. You can ask about the children's land. First of all, I received a paper processing. However, I don’t know how to solve the problem, how to take the problem, and how to solve the problem. I think there is a possibility that the same thing will happen. I don’t have to think about it now. I think there were various problems before going there. I would like to ask you while showing a detailed document from a wide variety of times, but if you don’t have to verify the details, the same will happen. Therefore, the re ation should be re ed. I think it will be a good organization for the first time. I think that you should not have a lid on the smell. I would like to ask a little more concrete in the future though I received it as a general theory because of such a refreshing processing. If it is really useful, it is good to use 70% of the in-pre ural production as a result of using 70% of the in-pre ural timber from the subsidy of forest forestry emergency maintenance business which was used as a cost of this construction. However, if you think about what was the purpose of thinking about it, we will develop the local industry. If the local industry is not moisturizing and promoting , it should be suitable for such a large construction. As a result, we did not utilize the local characteristics of the forest town, Takana town, and the original purpose was blowing somewhere and it became just a facility construction work. I think it was the use of money that I really did not have. I think that this project, which was wrong in order from the start, is the goal of construction. Use carpenters and wood workers in Takanamachi. It should be a big purpose. Kids Land can be used in the prefecture. However, I think that the content of the work was thin. Then, I think that the problem was dwarfed without being noticeable. Then, I would like to check one by one. As I had a response, the children’s department was removed until the design company was selected. So, I decided the child department to design Ono. So, where was the bidding? Director of the Future Division. The bid itself is the General Affairs Section, but where did you create a bid specification? Where did you create? It is the general manager to execute the office. However, there is a special specification of the Kids Land Kami New Construction Bid here. Where is this created?
○Chair (Yamaguchi Yuzo) Technical supervision, Mr. Ueda.
◎ For technical supervision (Hoshitsugu Ueda) special specification, the children's future section corresponds as the main section.
◆No.8 (Eiko Takazawa) Chair, No.8
○Chair (Yamaguchi Yuzo) No. 8, Mr. Takazawa
◆No.8 (Eiko Takazawa) I imagined a lot of things, but it seems that the wood cooperative had such a move. In October, the timber of this wood cooperative was構造 food, and the construction material was not available, so the timber sakae was entered. I was interacted with the Wood Cooperative Association and Industry Promotion Division. So before that, I will never say that the root is bad. We use local wood in the Industrial Promotion Division to foster local industry. I think it is a real thing. I was moved by such a person. So, until the bid ends, it is said that it will be public until the bidding is held by the board members from around July. So, on August 17th, the bid was held. That’s why I was able to make a sumi, but I was able to make it public, so I said that the sumi was taken from the Industrial Promotion Division on August 20. On August 25th, the conclusion of construction contract was a temporary parliament. So, it is said that the order from the industrial promotion department that I will take this, or the order was collected and explained by the union staff. Do you know that you were moving in this way?
Mr. Hirobata, Director of Industrial Promotion Division, Yuzo Yamaguchi
◎ Director of Industrial Promotion Division (Mr. Masahiro Hirohata) I have been pointed out to respond to our industrial promotion section here, but I would like to understand the real thing whether it is corrected or not. This project is organized as a project team so that the president of Echikawa can teach at the beginning. We have added the Industrial Promotion Division. In addition, we incorporate forest forestry maintenance business. This project was held in the second half of FY20. As for this relationship, it is a comprehensive forest maintenance business from the so-called upstream to the downstream, and of course, it is content that the mountain service is included in the upstream side, so this relationship is our history of responding to the industry promotion department. In addition, Hyogo Prefecture was formed with a 30 billion fund, and it is a three-year business from FY21 to FY23. In addition, it is said that the business is carried out by the council method of the public- collaborative, so it is a council that the wood union of Hyogo Prefecture joined as a member. In that seat, we also made proposals regarding the contents of this Kids Land, including Ta-Kancho and the mountain's business, and decided at the council. Since there is a variety of involvement in the area, I decided to be a project from April this year. In addition, there is one condition that this wood utilization rate is 70% or more of the prefecture, but there is a history of receiving the point of the local production disappearance in the previous parliament. In our town, the cedar is also important, but the cypress is also important. In the general theory of design recently, there is a current state that many cedar materials are used in the frame, but I suggested the proposal to use the cypress as a frame in the form of local production disappearing as I mentioned. We do not procure wood until the bid. In the field of adjustment, we made the basics of our department and made proposals to the department that will be summarized in the contents. We have a way to deal with the contents of the bid in such a form, but after the bid, we will nominate the supervision on the contract, so it is natural that the supervisor should be the chief director among multiple supervisors, so we have entered the adjustments on the side, but we are very pleased to say that the contents of the sufficiency are our division. In addition, since the contents of quotation are also involved in the specialized field, it is the contents of the report by making proposals to our staff. However, the price of the raw tree is determined by the relative transaction, so there is a reason that the price is price for the tender, so the material that the price is not determined will be reflected in the planned price of the bid.
◆No.8 (Eiko Takazawa) Chair, No.8
○Chair (Yamaguchi Yuzo) No. 8, Mr. Takazawa
◆No.8 (Eiko Takazawa) I adjusted to it. So, the quotation request form is also from the town manager office. After that, we have a list of wood used, and then a summary of the change. After all, when I hear it now, it was really a ske . It is a very question. Now, the Director of Industrial Promotion Division worked on the project team. So what did you do?
○Chair (Yamaguchi Yuzo) Technical supervision, Mr. Ueda.
◎ Technical supervision (Hoshitsugu Ueda) The project team has been interviewed by the chief of Echikawa, but it is the future section of children as the main section. So, there are a lot of experience in the industry promotion section, the earthquake resistance of the architecture, etc., which is familiar with wood, the education and general、 section, and the third section are related. On top of that, the deputy chief and the educator are included.
◆No.8 (Eiko Takazawa) Chair, No.8
○Chair (Yamaguchi Yuzo) No. 8, Mr. Takazawa
◆No.8 (Eiko Takazawa) If you are listening to the story, you will be very involved in the third section. That’s why I’m particularly involved before and after that tender. I also used to root, but I don’t say it’s bad, including that part. I said earlier, but it is necessary to be part of the local industry. After all, there is a lot of interest and pressure. I think that this problem will happen due to information management, internal systems, and how it is built. I think it is. Now, when I talked about it, I think it was a mid-career relationship. I think that the relationship of such a relationship was the result of this time. Therefore, after bidding, I will be able to manage the construction to the children's future section. Then, what about the project team? Industry promotion, general。 department.
○Chair (Yamaguchi Yuzo) Technical supervision, Mr. Ueda.
◎ Technical supervisor (Koji Ueda) The project meeting was originally started as a project meeting until the order, but the construction itself is a lot, so there are important decisions about the project as it is, and the construction supervisor is, of course, the children's future department is general supervisor, the chief supervisor, etc., but each meeting place is shared information with the related department. After that, we have joined the supervisor in the Industrial Promotion Division in order to perform instructions and consultations to timely contractors, so that we can supervise the construction with a wider range of measures.
◆No.8 (Eiko Takazawa) Chair, No.8
○Chair (Yamaguchi Yuzo) No. 8, Mr. Takazawa
◆No.8 (Eiko Takazawa) After all, the work of each other is divided into the educator and the town manager. Sorry, this entry is only available in Japanese. This is the first time for children’s future school to work. In such a way, did you think that you didn’t know each other’s work? However, as a special specification of the bid of this construction, I look at the specification and about the delivery of wood. Therefore, specify the wood to achieve this purpose. The delivery of wood is written to the timber cooperative and contact. Use of locally produced wood as much as possible, and the usage rate of Hyogo-ken wood is 70%. There is something like this, and after all I received the order, it is Kami-ku that faithfully sells the forest. That’s why I think it’s normal to move as far as possible to use the original tree of my own. It’s like you’re going to do something. Of course, as a result, it was a bad thing, but it is kiei that it judges where the bad thing was. So, on October 19th, where did you receive this report on the change of wood supply from Kiei? Where did you reach because there is no address?
○Chair (Yamaguchi Yuzoku)
◎Child’s Future Division Director (Masashin Echikawa)
◆No.8 (Eiko Takazawa) Chair, No.8
○Chair (Yamaguchi Yuzo) No. 8, Mr. Takazawa
◆8 (Eiko Takazawa) How did you reaction?
○Chair (Yamaguchi Yuzoku)
◎Mr. Masanobu Koshikawa (Chief of the Children's Future Division) I had to confirm whether it is true or not, so I went to Mr. Kiei, the JAS inspection factory on October 20. At that time, the wood cooperative association was the same seat, so there was a request from Mr. Morita and Mr. Imanaka who were the construction worker, and there was a complaint that the wood cooperative is talking like this, so I confirmed the fact from the union manager of the wood cooperative. I asked you that it is the same, so I will confirm it by mistake.
◆No.8 (Eiko Takazawa) Chair, No.8
○Chair (Yamaguchi Yuzo) No. 8, Mr. Takazawa
◆8 (Eiko Takazawa) I think that this wood association was also sweet. I think both of them were sweet. I think that there was a lot of blank parts in the three sections of the blank before coming here. In fact, with the cooperation of the Tanba Forest Products Promotion Center, it seems to be something called "Ogimoku". However, it should be inspected there, and it became a entanglement from the tree prosperity. That’s it. So, the project team suddenly disappears here. I think that all of these things are finished in the middle half. Then, I thought that I was the first one, and I had a lot of information about it at the office of Morita Imanaka. I think that Kiei had moved from the beginning to November last year and prepared wood. After all, do you think that you were really forced to do this? You can not prepare such as Kiei-san, if you do not really move from such early. The structure is a special wood. Now, I would like to use such things in cypress, which was also the president of the Industrial Promotion Division. I think it is necessary to verify each other really. In the morning of the town manager, there were many things from the construction of the lifelong learning center. We have a lot of work. You can also enter the feeding center. Even if it is not a wood produced in the town, it is not an order, so we need to engage in the organization, and internal control. Then, I think that it is the essence of the town of Takana. I would like to be able to lead to a better direction by little. I really intend to grow the industry in town, but I think it is different from losing credit. And when something goes wrong, it is necessary to make sure that each other finds something inside. I think I can tell you a lot. I think this is a lesson, but how do you think?
○Chair (Yamaguchi Yuzoku)
◆No.8 (Eiko Takazawa)
○Chair (Yozo Yamaguchi) Please give the answer to the child's future section chief.
◆No.8 (Eiko Takazawa)
◎Mr. Masanobu Echikawa, Director of the Children's Future Division, asked Mr. Takazawa for more information, and Mr. Kiei said, but Mr. Hirobata, Director of Hirobata, also said that this project has been adopted in a council that includes a private company in Hyogo Prefecture, and he knows that there is this business in autumn. Open conference That’s it. It is not possible that Morita and Imanaka JV will not bid. Mr. Imanaka Morita asked Mr. Kiei for his recent work. I would like to thank you for your understanding that it will not be possible to withdraw from the beginning. In addition, it is too big to proceed with this business only by the Children's Future Division, so that we have been increasing many times earlier. We also have business relationships. Therefore, we have not only the children's future section, but also the industry promotion section of the relationship, the education and general section, as well as the Vice-cho manager, the educator, the technical supervision, and the help of the people who are thinking about this big business. Therefore, I would like to thank you for your understanding because we are thinking that there is no problem until today.
◆8 (Eiko Takazawa) What is the top if you know as a town manager and this project team?
○Chair (Yamaguchi Yuzoku) It is said that the chief of the town does not enter, so please give it if you can answer in the area you know.
◆8 (Eiko Takazawa) You will need it in that part.
Mr. Kokoda, Deputy Director of Yamaguchi Yuzoku
◎ Deputy Director (Takao Kokoda) This work, basically use wood from Hyogo. In the case of using 70%, it was a project of national measures to support the country. Therefore, it is generally higher to use wood. However, there was a subsidy, so the restriction was to use local products in Hyogo Prefecture, and in that it is more essential. So, if you need to place an order for a normal job, it will take a quotation when the contractor takes this construction. So, when you want to procure the wood, of course, when you want to procure local wood in Kabi-ku, Hyogo Prefecture, we will take a quotation and put it in the price that fits the quotation. So, if the product is good or not from the company who took it, the bid has been bid, or if it is normal, it is good to use this material in the favor of material approval. As a result, I delivered this wood, but now the wood is raw wood, and it is not dry, so it is possible that the wood used is Kami-ku, and there is a reality that the local production material was not able to use easily, and it is not admitted as the orderer. As a result of the request of Morita Imanaka's joint venture, the orderer and the contractor use Kiei for the procurement of the material or the use of the material obtained through the Kami-ku's wood cooperative is to use the material that cleared the drying material. First of all, I asked for the drying material for the material, so I decided to use the materials that were inspected, so I would like to use the materials that do not pass the JAS standard, so I decided to use the materials that were not passed the JAS standard.
◆No.8 (Eiko Takazawa) Chair, No.8
○Chair (Yamaguchi Yuzo) No. 8, Mr. Takazawa
◆No.8 (Eiko Takazawa) It is a contrary to the fact that the Deputy Director of the Children’s Future Division and the Deputy Director said. I can't do anything before, so I'd like to make a construction contract. I did not go to JAS standards. However, it was said that the director of the Children’s Future Division was prepared by the company in the forest maintenance business. That’s why it’s said that it’s the same with others. It is said that there is no reason for preparing. It is contrary to what is said.
Mr. Kokoda, Deputy Director of Yamaguchi Yuzoku
◎ Deputy Director (Takao Kokoda) There are several companies before bidding. Of course, if you want to take this job, you will ask for a quote. Therefore, I think that there was a story between the company and the people, of course, whether you can put this wood into the wood cooperative. That is because I wanted to procure the work of the wood, so I decided to adjust it beforehand. In terms of design, it is reflected in the quotation unit price by the point of contact of the wood cooperative, so there is a elapsed sour。 that this material will be entered at a certain price during the quotation stage.
◆No.8 (Eiko Takazawa) Chair, No.8
○Chair (Yamaguchi Yuzo) No. 8, Mr. Takazawa
◆If you are Eiko Takazawa, you need to make such a plan from the early stage and move towards that situation. That’s why you’re doing it. It seems to be from the current answer. So, what happens if you say that you can’t do it if you’re doing it. I think that I really like to use this. Is it a good problem that you can finish only on the top?
Mr. Kokoda, Deputy Director of Yamaguchi Yuzoku
◎ Deputy Director (Takao Kokoda) The number of days to dry, the number of days to dry, and the number of days to dry the cedar material will be broken naturally if it is dry rapidly. That is, there is a time to bid after the tender announcement of July last year. That’s why wood cooperatives are able to dry the necessary materials for several days and prepare the materials for them. Of course, if you are a specialist, you can estimate that the material can be put at this price at your own judgment. For example, it is also good for Hyogo production. If you can't procure it in your own way, you can't reflect the price. In my own judgment, the material can be dried and resistant to strength, so I asked for the price, so I think that the responsibility of the time is correct.
◆No.8 (Eiko Takazawa) Chair, No.8
○Chair (Yamaguchi Yuzo) No. 8, Mr. Takazawa
◆No.8 (Eiko Takazawa) Therefore, I do not say that it seems to be different, but after all this specification is going, I have been doing such a purpose, and I have worked up to the project team, and this forest maintenance work is like this, so I have a reply that other companies know. That’s why you can’t use local trees. However, it was really impossible from construction to completion. I can't do that. Sorry, this entry is only available in Japanese. This is the same. There is no side skewers. No problem. This is a problem. It is 5 minutes, so it is only a word of shika meat. She said that it is important to focus on the sales of processed meat as a town manager and business. I think it is necessary to show business plans too. I pray that the survey report does not become a plan. Then, when you start small, will it become a business? I'd like to verify it and then proceed, but I can't get it back when I get started. It is Takanamachi. I can't get back. It’s nice to start. I would like to show you a plan if you put your goals here. I would like to show you a powerful plan. And it’s really good to talk about the chances and the town manager. I think that the damage of shika and inoshi is a major year and the counter。 is a very close issue. That's why we want to show you good blueprints. More
○Chair (Yozo Yamaguchi) Mr. Toda.
◎Manager (Toda Yoshiki) Firstly, I talked about a meeting with the dispatch staff, but the staff in charge of農業 cooperatives who came out to the administrative association were also together. I talked about how much the damage of the so-called harmful bird beast is. That’s why we’ve been talking about over 200 million in three years. Most of them are silica. That’s what we do. And if you hear what is happening in Nishiwaki, it seems that this 3 years has doubled compared to the previous 3 years. However, the speed of Nishiwaki said to be very high. It is a reported that it has become a victim of the same as the town of Takana. I would like to be aware that there is a huge damage to the horticultural bird. This is a magazine. It is a magazine that is called a monthlyクラブ magazine, but it is a magazine that all Japanクラブ club was issued. In that case, people of Takanamachi are posted. I can write this. Go ahead from the usual. "In particular, the damage caused by the shika of Yamamura continues to grow." The Hunting Association is also aging. What will happen if you have been in the past 10 years? First of all, Next, the laws and regulations for猟 are very。. However, it does not match the actual situation. It is written. Then, when you know the taste of vegetables, you will enter without fear. The rumining shika is a large food, so it is not possible to be bad at the beginning because it is very rough when a military comes out. It is a story of a traffic accident. "The grandson who 。 is traveling to the country where the new car is coming. This is an article. Then, the town began selling shika cuisine with the grant of the prefecture. It is a problem to dispose even if it captures the road of consumption. In Western Europe, shika meat is treated as high-end ingredients, and its use range is wide. We should also study how to cook. The undecided view to leave the shika that has been射ed in the wild is questioned the qualities of the , and it will be bought socially. The mindset that treats individual and shika meat as a gift from heaven proves the nature of the . '' Get Life Hunting is to give life, so we will process it later. And what you can use is how to write that it is the nature of the person who is trying to猟. When I read this, I was honest and experimental. Then, there will be one-quarter of the number that I said earlier while doing various books. In such a case, 50 to 80 individual processing is a category that can not be算umulated. It is written that the number of 200 processing heads is the quantity of the management base. In such a case, there are two types of 罠s: one-quarter, 800, and so-called 罠s, so there are various methods, but when there is a need to capture in such a situation, there was a story of getting a 800. That’s why I think it’s about 70 million people on the other hand. I think there will be more than 100 million damage in the next year. Then, you need to think about the individual processing that is good after all in one. Therefore, I would like to ask for a common understanding of the planning.
◆No.8 (Eiko Takazawa) Chair, No.8
○Chair (Yamaguchi Yuzo) No. 8, Mr. Takazawa
◆No.8 (Eiko Takazawa) I, I think there is really a need to consider this most important thing seriously. This is 70% of the prefecture. Grow the industry in Koshinmachi. Use a tree in town. I think the most important thing of the world is the discussion. I think it is important. And finally, I think. Kids Land created with trees grown in the town of Phnom Penh, everyone says in a town that is proud of. However, I think that this is something that can be proud of. A facility made of wood grown up in the town of Meguro. In town and outside town. The town manager told me that I really wanted to make this model, but I think this was something that I could really appeal to the town and the town. It is what you can appeal. And, I think that education is to grow from the unexpected place. It is a facility created by trees grown in town. A facility created by carpenters, workers, and everyone in the town of Meguro. What kindergartens and nursery schools are going to start from here? And I think that it will be a facility that has been loved by the residents. I would like the construction work. Kids Land Close
○President (Yozo Yamaguchi)
◎Edu。 chief (Kishihara Aki-kun) For the business using this tree, the tiding is 70% of the pre。ural material, so that Taka。 members say, I want to use the local production as much as possible. This is because everyone in the townspeople is busy, and we started with the desire to build as much as we can, if everything is 賄bery in the towns. All of the procurement of timber started with the specification of purchasing all from the cooperatives, with the promise of going to the cooperatives of Imanaka Morita through the Takana-gun wood cooperatives. If it is impossible, it must be built in the construction period, so it is not necessary to do it. I think that it is unexpected to say that the shop was not sticking to too much takana town production from the beginning. I would like to understand that I had the intention to use Takanamachi as much as possible.
○Chair (Yozo Yamaguchi) The answer to Mr. Takazawa was finished. Next, Masaaki Tamatai.
◆No.11(Taipei Masaaki) No.11、Taipei Masaaki I have received the permission of the Chair, so I will ask my general questions. How should I use a merger special bond to build a new building? On July 6, 2007, the Ta-Kancho Public Facility Review Committee was established, and the “Indications on the proper maintenance of public facilities” was investigated. I was also a member of the council. I think there were a lot of opinions about the government office. Therefore, it is the main hall of the residents, but Yachiyo Plaza is still under construction, following Kabi Plaza, and it is finally the main hall, but in the policy NO.11, it is approximately 8 billion yen as a seismic large-scale remodeling work of the main hall in the maintenance business of the building. When it is time to think about the construction of the building, how do the town managers think about new construction or renovation? In any case, I think that it is a problem that the town manager needs strong beliefs, and it does not realize if this is not. How about the view? When I think about the near future of Takanamachi while looking at the flow of the country and the prefecture, I feel that it is not possible in the municipality organization. At this time, I think that the currentコopus building, especially the second floor, is a total, so it is a former Nakamachi office built in 37, 42, and 7 years. If you look at it, you can't find barrier-free. And I think that it is not a range that can be done first even if you want to move the second floor with a wheelchair for disabled people. I think that we are responsible for both the manager and the director. Therefore, I think that it is necessary to aggregate as much as possible in the current庁舎opus building. If you look at the town of Ta-Kan, it is the most important thing to build a new building in the town of Aspar, and it is also good in the future. Aging and aging population of 20,000 is a matter of time, but a new building with a merger special bond is used to build a new building with a focus on ten years ahead. I think there are many thoughts on the scale, but I think it may be small. In 2015, the number of employees is 238, except for the part, but I think that it is not about 40 to 50 people in the hall, but I think that it will be a number that is close to it, so I will ask for the view of the town manager whether there is a need to work on the construction of the building.
○Chair (Yozo Yamaguchi) Mr. Toda.
◎There is a question in the direction that the town manager (Toda Yoshiki) is about the construction of the building from Mr. Tamatai. Contact Us I think it was a time when I merged two or three years ago. Policy No.11 The Kabi City Hall was crushed. Then, I made the maintenance of Kabi Plaza. Yachiyo is also working at Yachiyo Plaza. And crush the Yachiyo government office. I was thinking about it. Then, I thought that it would be difficult for residents to understand about building a new building in my feelings. It is true. And now, half of the feeling has not changed. However, this is the building in the present day, but it has been five years since then, and when we look back, we have not built a seismic structure, for example. So it is the office that has the counter headquarters that can be crushed first. The situation is clear. If you say anything, you will have a sudden feeling. In addition, it is a good place to play, but it is a town hall of 10,000 people. Therefore, I always think that you can get enough of the main building in the assumed that you have crushed the real main building and the other two. First of all, I don't think that. In such a situation, my idea is a little bit, but I think you can hear the answer in fact that it has changed gradually. The earthquake-resistant large-scale remodeling work of the main building was initially like that. For the earthquake-resistant large-scale remodeling work of the main building, the budget of the large-scale business with the planned business cost of ¥8 billion in the merger special bond business is planned in the future. It is the main building of this time, but the east building has already passed since 37. It is 37 years since the west building was built in 48. It has been 40 to 50 years since the construction, and the cracking of the floor is caused. And when you drop the ball, we are born. Also, this parliament building and parliament's room looks bizarre, but as you know, the wall fell during this meeting. It is a building that was such a thing. In the case of a merger, we calculated the maintenance of the main building by approx. ¥6 billion in the form of renovation of the existing building. In the case of partial reconstruction, it is a place where I played an estimate of ¥8 billion and ¥14 billion in the case of full reconstruction. We have made a transition in mind. Now, what to do in this building is that it is a strong belief as a member. It is a question that you can decide whether you are new or new. I think that the time of the main building is coming. First of all, I was thinking about refurbishing the current building, but the maintenance cost was ¥6 billion. In addition to refurbishment, temporary prefab buildings must be built. There is such a problem if it is rebuilt locally. It is necessary to secure a temporary building. In particular, it has been found that there is a considerable number of days and costs about the movement and restoration of the server of the electric bill of the building, and eventually it will be more than 10 billion yen beyond the planned business cost. And it is repeated, but it can be thought that it is quite annoying to the residents in many days and labor. I have thought that the local reconstruction here and the local reconstruction has become physically impossible. On the other hand, it was about 1 billion yen for new construction. Although it is an approximate cost, it may be a bit more expensive. The number of general calculations of Kato city was out. When Kato assumed to be a new building of the main building, it felt that it was 24 billion. Because the population size is different, it can not be compared at a g , but there is also aところで that 24 billion is quite severe. In fact, I went to Awaji city. Awaji City is a prefab building. Initially, I had a prefab in the main building. I heard that it was planned to go to the main building next to it, but now it is財政 difficult financially, and even the prefab property now, it is enough. It is a pre ated property, and it is possible to build in low cost. I understand that. In Awaji City, the total floor area is 4815m2, and it is 9 billion yen. Because the total floor area of the current building in Takanamachi is less than 3000m2, we will estimate that construction can be made up to 7 billion yen if the actual area is simple calculation. Even if you add electricity bills, etc. to this, it is a place that you can see now with the idea that you can build between ¥8 billion and ¥9 billion. If you do not know that the price of Nii Coal will fall in質litatively rather than reconstructing here. I would like to be aware that it is still moving to the judgment that there is also a construction of a new building of the shape of the city. This is the problem of the land. Therefore, we are not thinking of getting a new land. I would like to be a new building in the present location. In such a case, there is no doubt that it is one candidate for the use area next to Aspal. However, what is considered to be is that it is necessary to do the so-called earthquake resistance of the Central Public Hall further after this. If you think of it, it may be one candidate for the current location of the Central Community Center. Then, asparts, and then, you may think of this side. And this may be a bit impossible, but it may be possible to take it to the current parking lot of Beldy Hall. I think that the candidate site is now, it is. I don’t know what to do here, but if you think that this is a one-stop service, it will be far from the文化a Kaikan if you take it to Aspal. On the other hand, it is better to say that this is because of the relationship of the population movement of people in the middle ward. In addition, even when it comes to becoming a business from Yachiyo, I thought that this is better than going across the bridges beyond the other, and I can not organize my thoughts, but if you think that it is a one-stop service, I think that this neighborhood is better. However, in fact, I would like to have a specialist in this part of a library that has a comprehensive function together with the problem of this building and the central public hall so that I can do the first answer in the morning. There are various problems such as land problems and money problems. One-stop problem. However, it is also a big problem that it does not match immediately if you do not start considering immediately. It is not a completely zero remodeling of the building, while creating a form that can be understood by residents. I think that it is now, but this is another case if there is a separate draft in the commission of the construction. However, as I think, I think that it is a new construction in the shape of a cheap Nii Coal, which is a direction that I can see earlier, so I would like to understand one. Thank you.
◆No.11 (Mr. Masaaki Tamatai), No.11.
○Chair (Yamaguchi Yuzoku) No. 11、Taipei.
◆No.11 (Taipei Masaaki) I received the answer of the chief of the town, but my thoughts are Kabi-ku, Yachiyo-ku, and the main building. This is the answer of this local manager. However, the parking lot behind the building is not seen. Then, when the townspeople came to the building, it is still a foundation even if it is a seismic earthquake. In 37, 48 years, large and wooden building, there are many shrines that are strong assembling. So, in the future, is it and Shimizu construction? When we buy the land, we will come out of the amount, and we should say that it is one of the candidates. So, even if you are from the parking lot, the central public hall thought that this would be a good idea if you asked the library first and the members of Yasuda first, but if you were thinking well, it would be shocked and some of the new buildings and the heads of the town are all in this. From Disaster Prevention to Computer where to move it. It and prefab are absolutely clog. It takes a lot from the electric bill, it is cold and cold. After all, I built a good thing and said that the merger, doshu system, and this is the unknown number. Even if Kansai is a wide-area merger, it is not possible to enter Nara. It has been more than 5 years since it has been merged. 5 years In that, I think about this, and think about the townspeople, and I want to do the decision of the town manager here, and I want to do it first. In the public review committee, the first one is about 800 million yen. If it is such a thing, it is good to renovate. The committee is about six months, and every time you work, the members of the committee will come up with a variety of answers that would be new if you think of it. There are about six answers to this building. The first time, there were many other people. If it is 6th time, I think that the town manager has read this answer, but it has been two and a half years. I would like to think about it, but I would like to ask you again.
○Chair (Yozo Yamaguchi) Mr. Toda.
◎ Town manager (Toda Yoshiki) I think that it is very impossible to reconstruct this so-called building. However, when I raise it on a so-called thin plate, I think that it is difficult here, just by putting it in the mind that I have to raise it as a single proposal. It is a prefab, but I would like to see the Awaji City Hall. I think it is a person who can understand that it is a prefab, maybe it does not stop. There is another building that looks like it. It is said that it is better to be the back side of the Kita-Harima Prefectural Bureau, the back side or the south side of the company, the building is not prefab, but it is almost the same expenses as that, the Awaji is Hirame 19 million, and it is the Prefectural Bureau of the Government Building. Then, I think that it was probably more chaotic when Mr. Tamatai, prefab. It’s not. There is a building. It is not honest with extra luxury. However, there is no doubt that it will be a proud building that will be able to be the face of the town of 23000 enough, so I would like to thank you for your understanding. In addition, I think that it is also good that there is a possibility that you can also see the council again, so I would like to study together. Thank you for your understanding.
◆No.11 (Mr. Masaaki Tamatai), No.11.
○Chair (Yamaguchi Yuzoku) No. 11、Taipei.
◆No.11(Taipei Masaaki) Anyway, the government office is very important, so there is a disaster prevention relationship, so I will take several times, but I do not know what to say in the mouth that I suddenly got a review committee or do not make any foundation anyway, so I would like to proceed in advance. Close
○Chair (Yamaguchi Yuzoku) It is good answer. This will end the general question of today.
Schedule
○The chairperson (Yozo Yamaguchi) The next conference will resume from December 21 at 9:30 am.
Contact
○Chair (Yamaguchi Yuzoku) Today, we will be dissem、. Thank you for your long time. (Afternoon 3:45)